HHS IT Reform Cost Savings/Avoidance

Strategy ID Strategy Title Decision Date OMB Initiative Related UIIs Use of Savings Avoidance Amount Type FY2012 Amount Net or Gross FY2013 Amount Net or Gross FY2014 Amount Net or Gross FY2015 Amount Net or Gross FY2016 Amount Net or Gross FY2017 Amount Net or Gross FY2018 Amount Net or Gross FY2019 Amount Net or Gross FY2020 Amount Net or Gross FY2021 Amount Net or Gross
1 Printing and Reproduction 10/1/2010 Commodity IT 009-000006260 This cost savings will allow CDC to more efficiently use funds to better support the IT Infrastructure Invesment. cost-savings 4.7 Net 3.5 Net 7.15 Net 0 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
2 Employee IT Devices 10/1/2010 Commodity IT 009-000006260 This cost savings will allow CDC to more efficiently use funds to better support the IT Infrastructure Invesment. cost-savings 0 Net 3 Net 3.05 Net 0 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
3 HHS Email-as-a-Service 5/1/2013 Commodity IT 009-000329429,009-000006266 Savings will be directed to other critical IT development projects. cost-savings 0 Gross 0 Gross 0 Gross 3.468 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
4 Networx Service Level Agreement Credits 10/1/2011 Other 009-000006578 Returned to OpDivs for their use cost-savings 1.614 Gross 0.599 Gross 0.668 Gross 0.256 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
5 Networx Billing Verification 10/1/2011 Other 009-000006578 Returned to OpDivs for their use cost-savings 3.46 Gross 1.646 Gross 2.15 Gross 0.367 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
6 Contract Modification and Migration 10/1/2011 Other 009-000006578 Returned to OpDivs for their use cost-avoidance 3.218 Gross 1.61 Gross 3.26 Gross 0.182 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
7 DC Consolidation 3/28/2013 Data Center 009-000006260,009-000318289,009-000006265,009-000006338,009-000317481 Reduce refresh costs by reducing the number of physical servers at HHS data centers and reduce operating costs by reducing the number of HHS data centers. cost-avoidance 0 Gross 0.622 Net 6.016 Net 1.603 Net 1.308 Net 2.119 Net 0.166 Gross 0 Gross 0 Gross 0 Gross
8 Electronic Handbooks (EHBs) New O&M Contract 8/8/2016 Other 009-000000706 DESAM solicited and awarded a NITAAC CIO-SP3 Large Business GWAC contract to a single vendor (Accenture Federal LLC) to provide Enterprise EHBs O&M support (Base, plus-4 option years).  By consolidating the two O&M efforts, this provided HRSA a $3M per/year cost saving for EHBs O&M. The resultant savings will be reinvested to modernize and improve usability of EHBs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
9 (Core Business Investment) Laptop Broadband  5/16/2016 Other 009-000000708 Replaced 4G broadband services integrated in laptops with portable broadband devices that will save $218K annually in broadband costs.  The savings will be re-invested on requests previously identified by not funded.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.218 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
10 Spend Analysis Project 1/2/2016 Other NA The total amount of charges was less and was distributed/passed to the Program Offices to reduce the amount that they had to be tapped.  Allowing the funds to go back into their programs. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.562 Gross 0 Gross 0 Gross 0 Gross 0 Gross
11 SAS Software License Optimization 12/31/2014 Software License Management NA NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.715 Net 0.441 Net 0 Gross 0 Gross 0 Gross 0 Gross
12  OADC Division of Communication Services IT Systems maintenance and server reductions 11/1/2009 Other 009-000330896 NA cost-savings 0 Gross 0 Gross 0 Gross 0.135 Net 0.039 Net 0.006 Net 0 Gross 0 Gross 0 Gross 0 Gross
13 CDC PH Monitoring for Birth Defects, Development Disabilities, Disabilities and Health System Retirement savings 1/1/2015 PortfolioStat 009-000000614 NA cost-savings 0 Gross 0 Gross 0 Gross 0.278 Net 0.375 Net 0.898 Net 0 Gross 0.499 Gross 0 Gross 0 Gross
14 NCIPC Injury Prevention and Control System Retirements 7/7/2017 Other 009-000000524 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Net 0 Gross 0 Gross 0 Gross 0 Gross
15 CGH Global Health Business Support and Information Systems Cost reductions 7/20/2017 PortfolioStat 009-000004710 NA cost-savings 0 Gross 0 Gross 0 Gross 0.88 Net 1.041 Net 0.032 Net 0 Gross 0 Gross 0 Gross 0 Gross
16 CSELS Information Center Systems Retirements 6/13/2016 Other 009-000005414 NA cost-savings 0 Gross 0 Gross 0 Gross 0.802 Gross 0.200 Gross 0.160 Gross 0 Gross 0 Gross 0 Gross 0 Gross
17 OPHPR DSNS Supporting Applications 4/30/2015 PortfolioStat 009-000227136 NA cost-savings 0 Gross 0 Gross 0 Gross 0.002 Net 0.167 Net 0.513 Net 0 Gross 0 Gross 0.031 Gross 0 Gross
18 Cost reductions associated with providing IT infrastructure services and software licensing. 10/1/2011 Software License Management 009-000006260 Reinvestments used to upgrade aging server  infrastructure and increase storage capacity ; Reinvestments used to further the Enterprise software inventory associated with new technologies cost-savings 0 Gross 0 Gross 0 Gross 89.541 Gross 6.592 Gross 46.600 Gross 1.768 Gross 0 Gross 0 Gross 0 Gross
19 APMO Staff Reductions 10/1/2015 Other 009-000330822 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.675 Gross 0.218 Gross 0 Gross 0 Gross 0 Gross 0 Gross
20 EITPO SAS Software License Optimizatioin 10/1/2015 Software License Management 009-000003943 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
21 SAS License Cost Savings 10/1/2011 Software License Management 009-000003943 NA cost-savings 0 Gross 0 Gross 0 Gross 52.147 Net 0 Gross 0 Gross 7.441 Gross 6.607 Gross 7.698 Gross 7.373 Gross
22 OCISO Reduction in System Reimages 12/30/2015 Other 009-000001912 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.631 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
23 Data Center Closures 10/1/2012 Data Center 009-000406019 NA cost-savings 0 Gross 0 Gross 0 Gross 7.013 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.000 Gross 0.350 Gross
24 Delloite Contract Savings 10/1/2012 Commodity IT 009-000006788 NA cost-savings 0 Gross 0 Gross 0 Gross 12.5 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
25 CDC Internet Search moved to free DigitalGov Search 10/16/2015 Software License Management 009-000330896 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.160 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
26 IBM ELA Re-compete 5/1/2016 Software License Management 009-000006265 NA both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 5.153 Net 0 Gross 0 Gross 0 Gross 0 Gross
27 NIH ISDP 1/1/2016 Software License Management NA The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-savings 0 Gross 0 Gross 38.929 Net 40.134 Net 41.375 Net 42.655 Net 43.975 Gross 30.557 Gross 59.200 Gross 18.848 Gross
28 AHRQ Cloud 10/19/2017 Data Center 009-000382398 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.400 Gross 0.170 Gross 0.170 Gross 0.170 Gross 0 Gross
29 AHRQ Comprehensive Unit-Based Safety Program (CUSP) for Antibiotic Stewardship 10/19/2017 Other 009-000405993 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.070 Gross 0.110 Gross 0.110 Gross 0 Gross
30 AHRQ Consumer Assessment of Healthcare Providers and Systems (CAHPS) 10/19/2017 Other  009-000000489  IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.567 Gross 0.567 Gross 0 Gross
31 AHRQ Cybersecurity Support/IT Ops 9/30/2016 Other 009-000382218 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.052 Gross 0.096 Gross 0.600 Gross 0.600 Gross 0.600 Gross 0 Gross
32 AHRQ Enterprise Analytics 10/19/2017 Other 009-000000492 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.400 Gross 0 Gross 1.662 Gross 1.662 Gross 0 Gross
33 AHRQ Funding Transfer to HHS Supply Fund 10/20/2017 Other 009-000349110 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.252 Gross 0.252 Gross 0.252 Gross 0 Gross
34 AHRQ IT Business Operations Activities 4/13/2016 Other 009-000004672 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0.025 Gross 0 Gross 0 Gross 0.450 Gross 0.584 Gross 0 Gross 1.841 Gross 1.841 Gross 0 Gross
35 AHRQ IT Infrastructure Support 9/30/2016 Other 009-000382240 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.162 Gross 0.516 Gross 0 Gross 1.160 Gross 1.160 Gross 0 Gross
36 AHRQ IT Management 10/19/2017 Other 009-000349110 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.231 Gross 0.231 Gross 0.231 Gross 0 Gross
37 AHRQ National Guideline and National Quality Measures Clearinghouse 10/19/2017 Other 009-000000499 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.450 Gross 0.316 Gross 0.855 Gross 0.855 Gross 0.855 Gross 0 Gross
38 AHRQ National Resource Center for Health IT 10/19/2017 Other 009-000003967 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0.165 Gross 0 Gross 0 Gross 0.074 Gross 0 Gross 0 Gross 1.500 Gross 1.500 Gross 0 Gross
39 ARHQ IT Programmatic Activities 4/13/2016 Other 009-000004670 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.915 Gross 0.915 Gross 0 Gross
40 AHRQ Patient Safety Network & Web Morbidity and Mortality Rounds on the Web 10/19/2017 Other 009-000000500 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.108 Gross 0 Gross 0 Gross 0 Gross 0 Gross
41 AHRQ QSRS 10/19/2017 Other 009-000382401 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 5.692 Gross 5.692 Gross 0 Gross
42 AHRQ Quality Indicators (QI) 10/19/2017 Other 009-000382403 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.140 Gross 0.140 Gross 0 Gross
43 AHRQ Registry 10/19/2017 Other 009-000382402 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.134 Gross 0 Gross 0.344 Gross 0.344 Gross 0 Gross
44 AHRQ Systematic Review Data Inventory (SRDR) 10/19/2017 Other 009-000389238 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.019 Gross 0 Gross 0 Gross 0 Gross
45 AHRQ USPSTF Extranet 10/19/2017 Other 009-000382404
IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.067 Gross 0.014 Gross 0.014 Gross 0.014 Gross 0 Gross
46 AHRQ Web 10/19/2017 Other 009-000382405 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.207 Gross 1.207 Gross 1.207 Gross 0 Gross
47 AHRQ Medical Expenditures Panel Survey (MEPS) 10/19/2017 Other 009-000001424 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0.4 Gross 0 Gross 0 Gross 0 Gross 19.515 Gross 16.705 Gross 16.705 Gross 0 Gross
48 AHRQ Phone Purchase 9/1/2016 Other NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.163 Gross 0.130 Gross 0.130 Gross 0.130 Gross 0.130 Gross 0 Gross
49 CIO Position 1/1/2016 Other NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.234 Gross 0.084 Gross 0.032 Gross 0.032 Gross 0.032 Gross 0 Gross
50 Vacant DIT Position 1/1/2016 Other NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.177 Gross 0.177 Gross 0.177 Gross 0.177 Gross 0.177 Gross 0 Gross
51 Software Package Savings 10/1/2015 Software License Management NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.016 Gross 0.057 Gross 0.210 Gross 0.239 Gross 0.239 Gross 0 Gross
52 Hardware Savings 11/14/2016 Other NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.064 Gross 0.175 Gross 0.175 Gross 0.175 Gross 0 Gross
53 ITIO Shared Service 10/1/2015 Other NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-avoidance 1.254 Gross 1.293 Gross 1.332 Gross 1.374 Gross 1.416 Gross 1.460 Gross 1.306 Gross 1.306 Gross 1.306 Gross 0 Gross
54 Field SCCM Server Reduction 10/1/2015 Commodity IT 009-000333886 This cost savings will allow FDA to more efficiently use funds to better support the Agency's IT Program. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.320 Net 0 Gross 0 Gross 0 Gross 0.087 Net
55 ACL Cloud First 10/1/2014 Digital Services 009-000000584, 009-000000586 ACL's realized cost avoidance are reinvested in our IT portfolio to continue modernization and enhancement activities, or are returned to programs.   both 0 Gross 0 Gross 0 Gross 0 Gross 3.000 Net 3.000 Net 3.500 Net 0 Gross 0 Gross 0 Gross
56 Health Care Quality Information Systems Data Center Migration 1/1/2015 Data Center 009-000001465 The resulted savings will be used to support needed infrastructure enhancements.   both 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross
57 Health Care Quality Information Systems Data Center Cage Consolidation 1/1/2015 Data Center 009-000001465 The resulted savings will be used to support needed infrastructure enhancements.   cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Net 0 Gross 0 Gross 0 Gross 0 Gross
58 Labor for Cloud Environment Build vs. On Premise Oracle (HCQIS) 1/1/2017 Commodity IT 009-000380398 The resulted savings will be used to support needed infrastructure enhancements and further cloud automation. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross
59 Labor for Cloud Environment Build vs. On Premise Oracle (Quality Payment Program) 1/1/2016 Commodity IT 009-000380398 The result of these savings enabled the Agency to reduce requests for external/existing funding sources in support of MACRA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Net 12.000 Net 0 Gross 0 Gross 0 Gross 0 Gross
60 HCQIS VDI Desktop Infrastructure vs. Laptop Refresh 3/16/2017 Other 009-000380398 Support of additional infrastructure capacity needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.300 Gross 0 Gross 0 Gross 0 Gross 0 Gross
61 Monitor, Mouse, Keyboard Package not refreshed before QIO 12th SOW 1/17/2017 Other 009-00348468 Support of additional infrastructure capacity needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Net 0 Gross 0 Gross 0 Gross 0 Gross
62 Printers not refreshed before QIO 12th SOW 1/1/2017 Other 009-00348468 Support of additional infrastructure capacity needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.100 Net 0 Gross 0 Gross 0 Gross 0 Gross
63  RQST-IT throttle back O&M with ServiceNow Ramp Up  8/31/2015  Other   009-000005322   Leadership throttled back effort to O&M since ServiceNow ITSM project set to ramp up and replace DME work.  Resultant savings was swept back for leadership re-use.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
64 Per Capita reduction 11/30/2015 Other NA Analysis performed on staffing career lifecycles.  Savings achieved via cost avoidance in training of near retirement staff.  Resulting savings swept back for leadership re-use.  cost-savings 0 Gross 0 Gross 0 Gross 0.08 Gross 0.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
65  Disaster Recovery Project Management Support  9/30/2015  Data Center  NA  Given status of senior leadership decision making on disaster recovery, savings was achieved by reducing scope of support.  Funding was swept back for leadership re-use.   cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
66  CMDB project support  3/31/2016  Other   009-000005322   Savings achieved via effective scope negotiation in contract support.  Savings was swept back to leadership for re-use.   cost-savings 0 Gross 0 Gross 0 Gross 0.02 Net 0.022 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
67 Software Licenses Consolidation and Reduction 10/1/2016 Software License Management 009-000325773 Software Licenses were consolidated and repurposed to reflect a savings overall in FY16.  cost-savings 0 Gross 0 Gross 2.5 Gross 0 Gross 0.680 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
68 Configuration Management Database update/audit 10/1/2016  Other   009-000005322   Savings achieved via effective scope negotiation in contract support.  Savings was swept back to leadership for re-use.   cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.210 Net 0.255 Gross 0 Gross 0 Gross 0 Gross 0 Gross
69 Project Management Service for the FDA Disaster Recovery Project 10/1/2016  Other  NA  Given status of senior leadership decision making on disaster recovery, savings was achieved by reducing scope of support.  Funding was swept back for leadership re-use.   cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.280 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
70 RQST-IT support 10/1/2016  Other   009-000005322   Leadership throttled back effort to O&M since ServiceNow ITSM project set to ramp up and replace DME work.  Resultant savings was swept back for leadership re-use.   cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.499 Net 0.085 Gross 0 Gross 0 Gross 0 Gross 0 Gross
71 Microsoft Server Consolidation 6/30/2017 Software License Management 009-000325773 Hardware clusters are being created to support SQL, Server and others.  This reduces the per instance cost and allows more instances to be run on hardware without additional cost.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.249 Net 0.189 Gross 0 Gross 0 Gross 0 Gross 0 Gross
72 Microsoft End User Reduction 6/30/2017 Software License Management 009-000325773 Due to the reduction in server license costs from our server consolidation and decommissioning activities, the need for additional Windows/Office Suite component number is smaller than the original forecast.  Similarly, Project/Visio licenses conforms with these expectations and fall within the original funding projection. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.100 Net 1.150 Gross 0 Gross 0 Gross 0 Gross 0 Gross
73 MediRegs Cancellation 6/30/2017 Other 009-000327770 Low usage prompts canceling the renewal of MediRegs from the FDA IT Library Services.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.075 Net 0 Gross 0 Gross 0 Gross 0 Gross
74 Field Server Refresh 9/30/2016 Other 009-000333886 Reduce operational and future refresh costs by reducing the number of SCCM servers required to patch field desktop computers.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Net 0 Gross 0 Gross 0 Gross 0 Gross
75 Information Technology Clearance Process 1/1/2016 Software License Management 009-000407475  Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.007 Net 0 Net 0 Gross 0 Gross 0 Gross
76 Information Technology Clearance Process 1/1/2016 Software License Management 009-000001417 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.049 Net 0 Net 0 Gross 0 Gross 0 Gross
77 Information Technology Clearance Process 1/1/2016 Software License Management 009-000001417 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Net 0 Net 0 Gross 0 Gross 0 Gross
78 Information Technology Clearance Process 1/1/2016 Software License Management 009-000006223 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.075 Net 0 Net 0 Gross 0 Gross 0 Gross
79 Information Technology Clearance Process 1/1/2016 Other 009-000001417 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Net 0 Gross 0 Gross 0 Gross
80 Security ATO New Requirements 7/15/2017 Other 009-000004001 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.050 Net 0 Net 0 Gross 0 Gross 0 Gross
81 Security ATO New Requirements 7/15/2017 Other 009-000407500 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.050 Net 0 Net 0 Gross 0 Gross 0 Gross
82 Information Technology Clearance Process 9/1/2017 Software License Management 009-000408244 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.032 Net 0 Net 0 Gross 0 Gross 0 Gross
83 Moving to the Cloud 1/31/2014 Data Center 009-000350589 Used for business programs cost-avoidance 0 Gross 0 Gross 0.072 Gross 0.072 Gross 0.072 Gross 0.072 Gross 0.072 Gross 0 Gross 0 Gross 0 Gross
84 Security ATO New Requirements 10/23/2017 Other 009-000409338
To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.070 Net 0 Net 0 Gross 0 Gross 0 Gross
85 Mobile Device Reduction 10/1/2017 Digital Services 009-000349487 To be determined by the Contracting Officer cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Net 0 Net 0 Gross 0 Gross 0 Gross
86 IT Support Reduction using ITIO 10/1/2013 Other 009-000349487 Used for business programs cost-savings 0 Gross 2.948 Net 3.008 Net 2.96 Net 2.920 Net 2.784 Net 2.784 Net 0 Gross 0 Gross 0 Gross
87 000463 - CMS ART 4/10/2017 Other 009-000406200 The option year for O&M  was awarded below the priced option. The savings/avoidance were used to fund FISS modernization effort as well as Fee-For-Service Shared Systems data center shortfalls. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.158 Gross 0 Gross 0 Gross 0 Gross 0 Gross
88 000489 - HETS 4/1/2017 Other 009-000004414 The HETS redesign nPhase II work was reduced and combined with on going CR work and portal migration was postponed.The savings/avoidance were used to fund Project 812 and some went back to OFM to reallocate. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.229 Gross 0 Gross 0 Gross 0 Gross 0 Gross
89 001570 - NPICS 6/22/2017 Other 009-000282161 The option year for O&M was awarded below the priced option year. Savings went to a variety of projects: DME Maintenance and VDC web Hosting (000265),  CWF infoman Upgrade (000016), Operational Security for data center testing (007405), and  ITSM Base Yr (000010). cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.400 Gross 0 Gross 0 Gross 0 Gross 0 Gross
90 000795 - EES 7/31/2017 Other 009-000325876 Contract consolidation allowed reduced O&M costsand eliminated the need for a contract transition.  The savings went back to other Marketplace initiatives cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.729 Gross 0 Gross 0 Gross 0 Gross 0 Gross
91 000016 - CWF 6/1/2017 Other 009-000004253 The new contract award was for a shorter period of performance which reduced the FY 17 need. The savings were used to fund Fee-For-Service Shared Systems data center shortfalls, FISS procurement costs, and general sweeps for OFM to reallocate. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.691 Gross 0 Gross 0 Gross 0 Gross 0 Gross
92 000913 - MCS 7/1/2017 Other 009-000004256 The option year for O&M was awarded below  the priced option year and therefore the approved FY 17 Operating budget was upheld. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 3.238 Gross 0 Gross 0 Gross 0 Gross 0 Gross
93 CMS HITECH HBOSC Contract 3/1/2015 Other 009-000236620 The HOBSC contract was descoped due to the fact that the contract had 4 option years and a transition out period. The funding was cut in half for the 5th OY due to a limited amount of work.  The cost avoidance was returned to the main HITECH funding bucket.

cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 5.700 Gross 0 Gross 0 Gross 0 Gross 0 Gross
94 CMS HITECH NLR Developemt &  Support 7/1/2016 Other 009-000236620 The NLR Development & Support contract was descoped when the determination was made that the Quality Payment Program (QPP) would be rolled out January 2017.  The NLR will stop processing EP’s and HQR will start processing on January 1, 2018.  The cost avoidance was returned to the main HITECH funding bucket. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.030 Gross 0 Gross 0 Gross 0 Gross 0 Gross
95 CMS HITECH CDS to BDC Migration 4/4/2017 Other 009-000236620 The National Level Repository (NLR) and Research and Support Graphical User Interface (R&S GUI) Infrastructure was relocated to the Baltimore Data Center (BDC) for the two remaining options years on the contract.  The cost avoidance was returned to the main HITECH funding bucket. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
96 Encounter Data Systems 1/1/2017 Other 009-000006796 The result of these savings will enable the Agency to reduce requests for external/existing funding sources. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.000  Gross  4.000 Gross 0 Gross 0 Gross 0 Gross
97 HIGLAS 6/22/2016 Other 009-000001468 Consolidation of two contracts into one. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 9.000  Gross  18.000 Gross 0 Gross 0 Gross 0 Gross
98 Agency-Led TechStat Session 12/1/2011 Other NA NA cost-savings 0.8 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
99 Custom Reports 8/1/2017 Digital Services 009-000001362 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.093 Gross 0 Gross 0 Gross 0 Gross 0 Gross
100 Bureau-Led TechStat Session 5/1/2012 Other NA NA cost-savings 8.2 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
101 Mura CRM  1/20/2011 Digital Services 009-000001362 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.382 Gross 0 Gross 0 Gross 0 Gross 0 Gross
102 Mobile Devices  3/30/2016 Commodity IT 009-000386499 Utilize savings to upgrade equipment for the following quarters.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.018 Net 0 Gross 1.000 Gross 0 Gross 1.007 Gross
103 WebTMA  10/1/2016 Commodity IT 009-000006263 Savings will be reinvested towards local facility needs identified by local leadership. cost-savings 0.3 Net 3 Net 3 Net 3 Net 3.000 Net 3.000 Net 0 Gross 0 Gross 0 Gross 0 Gross
104 eCredentialing  3/1/2016 Digital Services 009-000006263 Deploy software to additional service areas cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.067 Net 0.400 Gross 9.000 Gross 0 Gross 0 Gross
105 Decommissioned Hardware 1/1/2017 Data Center 009-000006263 Utilize savings to upgrade equipment for the following quarters.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.750 Net 0 Gross 0 Gross 0 Gross 0 Gross
106 Clinton Indian Health Center - Virtual Server Project 7/1/2017 Data Center 009-000006263 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.018 Gross 0 Gross 0 Gross 0 Gross 0 Gross
107 Haskell Indian Health Center - Virtual Server Project 8/25/2017 Data Center 009-000006263 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.009 Gross 0 Gross 0 Gross 0 Gross 0 Gross
108 Watonga Indian Health Center - Virtual Server Project 7/1/2017 Data Center 009-000006263 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.009 Gross 0 Gross 0 Gross 0 Gross 0 Gross
109 El Reno Indian Health Center - Virtual Server Project 7/1/2017 Data Center 009-000006263 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.009 Gross 0 Gross 0 Gross 0 Gross 0 Gross
110 Virtualization of Physical Servers 1/1/2017 Data Center 009-000006263 Savings will be reinvested towards local facility needs identified by local leadership and the health board. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Gross 0 Gross 0 Gross 0 Gross 0.235 Gross
111 Meaningful Use - Certified EHS Program 8/12/2010 Other 009-000001362 NA cost-avoidance 0.668 Gross 7.837 Gross 8.158 Gross 7.892 Gross 1.936 Gross 0.238 Gross 0 Gross 0 Gross 0 Gross 0 Gross
112 Eliminating Physical Servers - Virtualization  1/1/2012 Data Center 009-000006263 Savings will be reinvested towards local facility needs identified by local leadership and the health board. cost-savings 6.135 Gross 5.33 Gross 5.097 Gross 4.754 Gross 6.396 Gross 5.508 Gross 0 Gross 0 Gross 0 Gross 0 Gross
113 Email - Use Shared Service Provider 10/1/2012 Commodity IT 009-000000708 Avoiding increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.939 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
114 Email - Use Shared Service Provider 10/1/2013 Commodity IT 009-000000708 Avoiding increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.939 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
115 Email - Use Shared Service Provider 10/1/2014 Commodity IT 009-000000708 Avoiding increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.939 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
116 Email - Use Shared Service Provider 10/1/2015 Commodity IT 009-000000708 Avoiding increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.939 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
117 Email - Use Shared Service Provider 10/1/2016 Commodity IT 009-000000708 Avoiding increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.939 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
118 SharePoint Hosting - Used Shared Service Provider 10/1/2012 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
119 SharePoint Hosting - Used Shared Service Provider 10/1/2013 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
120 SharePoint Hosting - Used Shared Service Provider 10/1/2014 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
121 SharePoint Hosting - Used Shared Service Provider 10/1/2015 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
122 SharePoint Hosting - Used Shared Service Provider 10/1/2016 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
123 Data Center Consolidation 10/1/2015 Data Center 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
124 Data Center Consolidation 10/1/2016 Data Center 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
125 Business Intelligence 10/1/2016 Software License Management 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
126 Printer Reduction 10/1/2015 Other 009-000000708 Reinvesting savings in the programs.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.035 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
127 Printer Reduction 10/1/2015 Other 009-000000708 Reinvesting savings in the programs.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.035 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
128 EHB Contact Center Contract 9/28/2017 Other 009-000000706 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.150 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
129 Data Warehouse 10/1/2016 Digital Services 009-000004159 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.347 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
130 Changed Regional Support Provider 5/1/2016 Other 009-000000706 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
131 Changed Regional Support Provider 10/1/2016 Other 009-000000707 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
132 Cost Avoidance by using Shared Tier I Helpdesk  1/1/2013 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
133 Cost Avoidance by using Shared Tier I Helpdesk  1/1/2014 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
134 Cost Avoidance by using Shared Tier I Helpdesk  1/1/2015 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
135 Cost Avoidance by using Shared Tier I Helpdesk  1/1/2016 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
136 Cost Avoidance by using Shared Tier I Helpdesk  1/1/2017 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
137 Eliminated physical COOP Site to Virtual COOP 12/31/2015 Other 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.068 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
138 Eliminated physical COOP Site to Virtual COOP 12/31/2016 Other 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.068 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
139 Eliminated physical COOP Site to Virtual COOP 12/31/2017 Other 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.068 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
140 Eliminated Telephone Lines 10/1/2014 Other 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
141 Records Management 1/1/2015 Other 009-000004168 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.154 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
142 Records Management 1/1/2016 Other 009-000004168 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.154 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
143 Records Management 1/1/2017 Other 009-000004168 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.154 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
144 Records Management 1/1/2018 Other 009-000004168 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.154 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
145 FISSI Wireless Contract 10/1/2016 Commodity IT 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.095 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
146 FISSI Wireless Contract 10/1/2016 Commodity IT 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.095 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
147 Printing Posters In House 10/1/2016 Other 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.030 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
148 HR Systems - Use Shared Service Provider 1/1/2013 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
149 HR Systems - Use Shared Service Provider 1/1/2014 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
150 HR Systems - Use Shared Service Provider 1/1/2015 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
151 HR Systems - Use Shared Service Provider 1/1/2016 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
152 HR Systems - Use Shared Service Provider 1/1/2017 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
153 Financial System - Use Shared Service Provider 1/1/2013 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
154 Financial System - Use Shared Service Provider 1/1/2014 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
155 Financial System - Use Shared Service Provider 1/1/2015 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
156 Financial System - Use Shared Service Provider 1/1/2016 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
157 Financial System - Use Shared Service Provider 1/1/2017 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
158 Changed Video Bridge Service Providers 10/1/2015 Other 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.150 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
159 Changed Video Bridge Service Providers 10/1/2016 Other 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.150 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
160 Changed Video Bridge Service Providers 10/1/2017 Other 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.150 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
161 New Desktop imagine tool 10/1/2015 Other 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
162 Use Shared HHS Internet Provider 10/1/2012 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
163 Use Shared HHS Internet Provider 10/1/2013 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
164 Use Shared HHS Internet Provider 10/1/2014 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
165 Use Shared HHS Internet Provider 10/1/2015 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
166 Use Shared HHS Internet Provider 10/1/2016 Commodity IT 009-000000708 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
167 Moved AHRF system to Data Warehouse Platform 1/1/2017 Other 009-000004159 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.071 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
168 Authentication Management System - Used Shared Service Provider 1/1/2016 Commodity IT 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
169 Authentication Management System - Used Shared Service Provider 1/1/2017 Commodity IT 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
170 Authentication Management System - Used Shared Service Provider 1/1/2018 Commodity IT 009-000000708 Revinvested the cost savings in the programs.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
171 NPDB Cloud migration (to move NPDB infrastructure, applications and data, from data center to infrastructure as a service (IaaS) cloud environment). 1/1/2014 Data Center 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.444 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
172 NPDB Cloud migration (to move NPDB infrastructure, applications and data, from data center to infrastructure as a service (IaaS) cloud environment). 1/1/2015 Data Center 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.444 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
173 NPDB Cloud migration (to move NPDB infrastructure, applications and data, from data center to infrastructure as a service (IaaS) cloud environment). 1/1/2016 Data Center 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.444 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
174 NPDB Cloud migration (to move NPDB infrastructure, applications and data, from data center to infrastructure as a service (IaaS) cloud environment). 1/1/2017 Data Center 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.444 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
175 NPDB Customer Service 1/1/2015 Other 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.170 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
176 NPDB Customer Service 1/1/2016 Other 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.170 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
177 NPDB Customer Service 1/1/2017 Other 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.170 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
178 NPDB Bridge Contract 7/1/2017 Other 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.678 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
179 NPDB Generation 5 Contract 1/1/2012 Other 009-000001361 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 19.878 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
180 BMISS Customer Call Center 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.600 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
181 BMISS Application Processing 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.101 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
182 BMISS Application Processing 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
183 BMISS Application Processing 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
184 BMISS Application Processing 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
185 BMISS Application Processing 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
186 BMISS Application Processing 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.025 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
187 BMISS Financials 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.912 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
188 BMISS Financials 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
189 BMISS Financials 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
190 BMISS Financials 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
191 BMISS Financials 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
192 BMISS Financials 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.033 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
193 BMISS In Service Verifications 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
194 BMISS In Service Verifications 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
195 BMISS In Service Verifications 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
196 BMISS In Service Verifications 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
197 BMISS In Service Verifications 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
198 BMISS In Service Verifications 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 3.740 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
199 BMISS Sites and Job Center 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
200 BMISS Sites and Job Center 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
201 BMISS Sites and Job Center 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
202 BMISS Sites and Job Center 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
203 BMISS Sites and Job Center 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
204 BMISS Sites and Job Center 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.774 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
205 BMISS Customer Service 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
206 BMISS Customer Service 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
207 BMISS Customer Service 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
208 BMISS Customer Service 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
209 BMISS Customer Service 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
210 BMISS Customer Service 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.646 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
211 BMISS - BCHDANET 1/1/2012 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
212 BMISS - BCHDANET 1/1/2013 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
213 BMISS - BCHDANET 1/1/2014 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
214 BMISS - BCHDANET 1/1/2015 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
215 BMISS - BCHDANET 1/1/2016 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
216 BMISS - BCHDANET 1/1/2017 Other 009-000004158 Savings are used to increase the number of award amounts for the Bureau's programs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.287 Net 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
217 Used Shared ePMAP Provider 1/1/2017 Other 009-000205796 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 3.336 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
218 Enterprise Content Management 1/1/2017 Other 009-000205796 Workflow Automation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.030 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
219 EHBs - Business Process Streamlining 10/1/2011 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 3.732 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
220 EHBs - Business Process Streamlining 10/1/2012 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 4.082 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
221 EHBs - Business Process Streamlining 10/1/2013 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 5.929 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
222 EHBs - Business Process Streamlining 10/1/2014 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 7.083 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
223 EHBs - Business Process Streamlining 10/1/2015 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 7.117 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
224 EHBs - Business Process Streamlining 10/1/2016 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 6.889 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
225 EHBs - Business Process Streamlining 10/1/2017 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 6.894 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
226 EHBs - New Feature 10/1/2011 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 1.299 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
227 EHBs - New Feature 10/1/2012 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 3.244 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
228 EHBs - New Feature 10/1/2013 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 3.514 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
229 EHBs - New Feature 10/1/2014 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 4.996 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
230 EHBs - New Feature 10/1/2015 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 5.795 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
231 EHBs - New Feature 10/1/2016 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 8.706 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
232 EHBs - New Feature 10/1/2017 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 10.817 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
233 EHBs - Performance Improvement  10/1/2014 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
234 EHBs - Policy Changes 10/1/2014 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.188 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
235 EHBs - Policy Changes 10/1/2015 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.188 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
236 EHBs - Policy Changes 10/1/2016 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.333 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
237 EHBs - Policy Changes 10/1/2017 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.333 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
238 EHBs - Reporting 10/1/2013 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
239 EHBs - Reporting 10/1/2014 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
240 EHBs - Reporting 10/1/2015 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
241 EHBs - Reporting 10/1/2016 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
242 EHBs - Reporting 10/1/2017 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
243 EHBs - Self Service 10/1/2012 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
244 EHBs - Self Service 10/1/2013 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
245 EHBs - Self Service 10/1/2014 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.660 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
246 EHBs - Self Service 10/1/2015 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 1.140 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
247 EHBs - Self Service 10/1/2016 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 1.524 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
248 EHBs - Self Service 10/1/2017 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 2.194 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
249 EHBs - System Integration 10/1/2011 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.649 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
250 EHBs - System Integration 10/1/2012 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.716 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
251 EHBs - System Integration 10/1/2013 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.702 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
252 EHBs - System Integration 10/1/2014 Digital Services 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 1.045 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
253 EHBs - System Integration 10/1/2015 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 1.018 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
254 EHBs - System Integration 10/1/2016 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.996 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
255 EHBs - System Integration 10/1/2017 Other 009-000000706 Avoided increasing cost to the program.  Cost avoidance is reinvested in new modernization and enhancement activities. both 0 Gross 0 Gross 0 Gross 0 Gross 0.996 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
256 EHBs - Technology  10/1/2015 Other 009-000000706 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.330 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
257 EHBs - Technology  10/1/2016 Other 009-000000706 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.280 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
258 EHBs - Technology  10/1/2017 Other 009-000000706 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 2.407 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
259 EHBs - Consolidation 10/1/2015 Other 009-000000706 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.140 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
260 EHBs - Consolidation 10/1/2017 Other 009-000000706 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.140 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
261 Swift  1/1/2017 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.999 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
262 HERD 1/1/2017 Other 009-000227056 The savings are used/reinvested to accomplish other high priority DME and O&M program initiatives. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.013 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
263 Space Tracking Sytems 5/1/2017 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.380 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
264 Space Tracking Sytems 10/1/2017 Other 009-000227056 Avoided increasing cost to the program.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.380 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
265 CDM IT Security Tools and HHS Supplied Security Tools 10/1/2015 Other 009-000004135 Avoided purchasing tools from HRSA's budget cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.949 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
266 CDM IT Security Tools and HHS Supplied Security Tools 10/1/2016 Other 009-000004135 Avoided purchasing tools from HRSA's budget cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.431 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
267 CDM IT Security Tools and HHS Supplied Security Tools 10/1/2017 Other 009-000004135 Avoided purchasing tools from HRSA's budget cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.264 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
268 ACL Cloud First 10/1/2014 Data Center 009-000000578, 009-000000584, 009-000000586 ACL's realized cost avoidance are reinvested in our IT portfolio to continue modernization and enhancement activities, or are returned to programs.   both 0 Gross 0 Gross 0 Gross 0 Gross 0.375 Net 0.500 Net 0.500 Net 0 Gross 0 Gross 0 Gross
269 Data Center Consolidation 2/16/2016 Data Center NA Savings were reinvested into upgrading network performance and resiliency cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.290 Gross 0 Gross 0 Gross 0 Gross 0 Gross
270 NCCDPHP System Retirements 6/5/2012 Other 009-000000607 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 3.827 Gross 0.104 Gross 0.104 Gross 0 Gross
271 Fraud Prevention System (FPS).  FPS runs sophisticated analytics against Fee for Service claims to identify, prevent, and stop potentially fraudulent, wasteful, or abusive claims.  6/16/2011 Other 009-000281361 A variety of tools and actions are used to prevent improper payments as a result of FPS.  These include claims denials, payment suspensions, Medicare billing privilege revocations, and law enforcement referrals.  FPS helps CMS target fraudulent providers and suppliers, reduce the administrative and compliance burdens on legitimate providers and suppliers, and prevent fraud so that funds are not diverted from providing beneficiaries with access to quality health care. cost-avoidance 115.400 Gross 250.100 Gross 454.000 Gross 604.750 Gross 527.060 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
272 Data Services Hub.  Federal Data Services Hub (DSH) provides a single interface for state agencies, health insurance exchanges, and other stakeholders to verify eligibility for health insurance programs.  7/1/2017 Other 009-000267389 CMS reduced operational costs during a contract recompete based on the efficiencies and technical enhancements realized since the initial contract award (this was the first recompete of the contract). Savings was used to cover other operational costs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 27.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
273 MARx Operations and Maintenance 1/15/2014 Other 009-000004261 The MARx contract was descoped to accommodate mandated FY14 budget cuts.   both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.300 Gross 0 Gross 0 Gross 0 Gross 0 Gross
274 MAPD Business Operations and Help Desk 1/15/2014 Other 009-000004261 Business Operations and Help Desk Contracts consolidated into BOSC contract.  Strategy was developed in an attempt to streamline and to accommodate mandated FY14 budget cuts.   both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.800 Gross 0 Gross 0 Gross 0 Gross 0 Gross
275 MAPD Project Management 11/15/2013 Other 009-000004261 Project Management Support Contract Discontinued in an attempt to accommodate mandated FY14  budget cuts.   both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.550 Gross 0 Gross 0 Gross 0 Gross 0 Gross
276 MAPD Testing 11/30/2013 Other 009-000004261 Testing contracts now handled as consolidated Testing Coordination contract.   Strategy was developed in an attempt to streamline and to accommodate mandated budget cuts.   both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 5.028 Gross 0 Gross 0 Gross 0 Gross 0 Gross
277 Medicare Beneficiary Databasse (MBD) 11/30/2013 Other 009-000004263  MBD Testing contract not renwed due to Strategy change.  Testing contracts now handled as consolidated Testing Coordination contract.  This strategy  was developed in an attempt to streamline and to accommodate mandated FY14 budget cuts.   both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.700 Gross 0 Gross 0 Gross 0 Gross 0 Gross
278 SharePoint Contract Consolidation 1/1/2017 Other 009-000282281 Used toward other operational needs. both 0 Gross 0 Gross 0 Gross 0 Gross 4.180 Gross 4.200 Gross 3.200 Gross 0 Gross 0 Gross 0 Gross
279 MACBIS Data Center move  7/1/2017 Data Center 009-000316503 8 Systems moved from CDS to Lockheed Martin Data Center in August, 2017.  The last two option years of the CDS contract were not exercised.  Savings were used for other to cover other budget shortfalls. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.372 Gross 4.288 Gross 0 Gross 0 Gross 0 Gross
280 CA Enterprise License 9/15/2017 Software License Management 009-000006265 Descope contract to remove unused licenses.  Savings used for other operational priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.211 Gross 0.213 Gross 0 Gross 0 Gross
281 NLR Hosting 8/15/2017 Data Center 009-000236620 Moved application to BDC where there was unused capacity.  Cost avoided used for other HITECH needs. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.163 Gross 4.527 Gross 0 Gross 0 Gross
282 Marketplace Savings 9/1/2017 Data Center 009-000006265 Descoped and consolidated; Amount saved/avoided to be used for other operational priorities. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 9.385 Gross 4.287 Gross 0 Gross 0 Gross
283 BDC 2.0 8/1/2014 Data Center 009-000006265 Consolidated physical and virtual systems/services from LMDC West to the BDC and LMDC East.  LM DC West was shut down.  Savings and cost avoided used for other operational needs. both 0 Gross 0 Gross 0 Gross 0.374 Gross 1.694 Gross 2.907 Gross 2.364 Gross 3.160 Gross 0 Gross 0 Gross
284 AHRQ Evidence NOW Exchange (ENX) 12/31/2017 Other 009-000382399 IT Portion of Reduction in Appropriation cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.044 Gross 0.044 Gross 0 Gross
285 Data Center Optimization Initiative (DCOI) 1/1/2018 Data Center NA Funding Reinvested in Taps for Data Act and other Administrative Costs cost-savings 0 Gross 0 Gross 0.085 Gross 0.071 Gross 0.111 Gross 0.129 Gross 0.129 Gross 0.129 Gross 0.129 Gross 0.070 Gross
286 NHLBI ePMAP 1/1/2016 PortfolioStat 009-000326445 Cost avoidance has been used to reduce RMS budgets to fund additional extramural research. both 0 Gross 0 Gross 0.702 Gross 1.1 Gross 1.800 Gross 2.200 Gross 0 Gross 0 Gross 0 Gross 0 Gross
287 NHLBI Reporting and Analytics 9/30/2014 PortfolioStat 009-000326445 Cost avoidance was re-purposed to support the emerging personnel requirements of the TOPMed program, a high priority strategic initiative for both NHLBI and NIH.  cost-avoidance 0 Gross 0 Gross 0 Gross 0.025 Gross 0.050 Gross 0.400 Gross 0 Gross 0 Gross 0 Gross 0 Gross
288 NHLBI TRAC 9/30/2012 PortfolioStat 009-000326445  Cost savings contribute to the reduction in administrative FTEs and hence provide scope for more scientific staff. cost-avoidance 0 Gross 0.6 Gross 0.1 Gross 1.2 Gross 1.800 Gross 2.400 Gross 0 Gross 0 Gross 0 Gross 0 Gross
289 NHLBI TRAC 9/30/2012 PortfolioStat 009-000326445 Cost savings reduce growth in RMS overhead costs allowing more funding for research. cost-savings 0 Gross 0.009 Gross 0.009 Gross 0.01 Gross 0.011 Gross 0.012 Gross 0 Gross 0 Gross 0 Gross 0 Gross
290 NHLBI SPA 9/30/2015 PortfolioStat 009-000326372 Cost savings are FTE costs and the reduction in administrative staff funds additional scientific management positions. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross 0.020 Gross 0 Gross 0 Gross 0 Gross 0 Gross
291 NHLBI DOCS 9/30/2015 PortfolioStat 009-000326445  Cost savings were used to fund other IT investments used to further reduce overhead and improve efficiency. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Gross 0.400 Gross 0 Gross 0 Gross 0 Gross 0 Gross
292 NIH Puchasing Program  9/30/2014 Commodity IT NA How the savings is used or reinvested is not available to us. cost-savings 0 Gross 0 Gross 0 Gross 41.386 Gross 60.838 Gross 89.053 Gross 0 Gross 0 Gross 0 Gross 0 Gross
293 Data Centers 2/28/2010 Data Center 009-000339398 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. both 1.33 Gross 2.073 Gross 2.642 Gross 3.519 Gross 4.165 Gross 4.304 Gross 6.212 Gross 6.452 Gross 7.002 Gross 7.363 Gross
294 eRA GM Workbook Redesign 1/1/2015 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.200 Gross 0 Gross 0 Gross 0 Gross 0 Gross
295 eRA Program Checklist Redesign 1/1/2016 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.471 Gross 0 Gross 0 Gross 0 Gross 0 Gross
296 eRA Program Management Module Redesign 1/1/2016 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross
297 eRA Prior Approval Module 1/1/2015 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0.300 Gross 0 Gross 0 Gross 0 Gross 0 Gross
298 eRA Pay Plan Module 1/1/2014 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0.272 Gross 0.272 Gross 0.272 Gross 0 Gross 0 Gross 0 Gross 0 Gross
299 eRA Electronic Tracking and Analysis Module 1/1/2011 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0.114 Gross 0.114 Gross 0.114 Gross 0.114 Gross 0.114 Gross 0.114 Gross 0 Gross 0 Gross 0 Gross 0 Gross
300 PRACS Clearance System 1/1/2015 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.214 Gross 0 Gross 0 Gross 0 Gross 0 Gross
301 eRA Electronic Submission of Administrative Supplements 1/1/2011 Digital Services 009-000001410 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0.017 Gross 0.032 Gross 0.035 Gross 0.047 Gross 0.058 Gross 0.072 Gross 0 Gross 0 Gross 0 Gross 0 Gross
302 PubMed  1/1/2014 Other 009-000381665 This cost savings results of HHS OPDIVS being able to comply with the OSTP directive for making agency publications accessible to public through NLM's manuscript submission system and PubMed Central both 0 Gross 0 Gross 0.735 Gross 0.455 Gross 0.305 Gross 0.305 Gross 0 Gross 0 Gross 0 Gross 0 Gross
303 FY17 - Converting Legacy Phone Lines 11/1/2016 Digital Services 009-000339401 Most of these savings directly benefited and were realized by the ICs. These initiatives involve migrating legacy, costly, and often distributed capabilities to modern, enterprise solutions.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 4.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
304 FY17 - Enterprise License Agreement 11/1/2016 Digital Services 009-000339401 Realized by ICs when UCC negotiated and established a new Enterprise License Agreement with WebEx. The new agreement’s enterprise-wide access allows ICs to discontinue funding IC-specific collaboration solutions such as GoToMeeting, GlobalMeet, and limited-user WebEx accounts and avoid redundant costs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.526 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
305 FY17 - Discontinued Legacy Web Conferencing Software and Servers 11/1/2016 Digital Services 009-000339401 CIT discontinued legacy web conferencing software and servers (Adobe Connect). Savings invested in equipment refresh.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.173 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
306 FY17 - Migrating Web Services Applications to New Hardware 11/1/2016 Digital Services 009-000339401 Realized by ICs by migrating Web Services applications to new hardware. This is based on cost savings of $5K per month, per application. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
307 FY17 - Advance Optical Technology, Using Less Fiber, Disconnecting 25 Cable Connection Circuits 11/1/2016 Digital Services 009-000339401 Use less fiber though advanced optical technology. Savings used to modernize network circuits.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.515 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
308 FY17 - Economies of Scale in Purchasing Computational Cores and Storage in Large Quantities; all NIH Researchers have Access to the Computational Resources they need 11/1/2015 Digital Services 009-000339398 Savings directly passed on to IC's. Instead of each institute having to purchase their computational needs to a commercial vendor at a much higher price they are able to leverage the Enterprise High Performance Computing at lower negotiated prices.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.800 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
309 FY16 - Increased Capacity and Performance for Transit of Scientific Data; Lower IC Spending on LANs and Firewalls 11/1/2015 Digital Services 009-000339401 Network Modernization-operations and maintenance.  Software licensing for Cisco high speed routers to support the 100Gb backbone and NIH Internet Service.  Maintenance for new cellular network equipment.  Additional fiber optic circuitry to support higher redundancy and speed fo NIH off campus buildings. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
310 FY16 - Transition from Legacy Voice Network to UCU VoIP; plus Additional Future Savings as More ICs Transition 11/1/2015 Digital Services 009-000339401 Most of these savings directly benefited and were realized by the ICs. These initiatives involve migrating legacy, costly, and often distributed capabilities to modern, enterprise solutions.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.600 Gross 0 Gross 0 Gross 0 Gross 0 Gross
311 FY16 - Enterprise Agreement with Microsoft: Converted from per Device Pricing to per user Pricing 11/1/2015 Digital Services 009-000339399 Savings directly passed on to IC's both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.250 Gross 0 Gross 0 Gross 0 Gross 0 Gross
312 FY16 - Economies of Scale in Purchasing Computational Cores and Storage in Large Quantities; all NIH Researchers have Access to the Computational Resources they need 11/1/2015 Digital Services 009-000339398 Savings directly passed on to IC's. Instead of each institute having to purchase their computational needs to a commercial vendor at a much higher price they are able to leverage the Enterprise High Performance Computing at lower negotiated prices.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.800 Gross 0 Gross 0 Gross 0 Gross 0 Gross
313 Lease Buyout 9/30/2015 Other 009-000339399 The cost savings have been used by NCI to fund other strategic initiatives including futher network modernization.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 1.164 Gross 2.327 Gross 0 Gross 0 Gross 0 Gross 0 Gross
314 Contract Consolidation 9/30/2015 Other NA The cost savings have been used by NCI to fund other strategic initiatives including futher network modernization.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.750 Gross 2.250 Gross 0 Gross 0 Gross 0 Gross 0 Gross
315 Unified Communication 9/30/2015 Other 009-000339401 The cost savings have been used by NCI to fund other strategic initiatives including futher network modernization.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.388 Gross 0.680 Gross 0 Gross 0 Gross 0 Gross 0 Gross
316 Infrastructure Refresh (Network Modernization) 9/30/2014 Other 009-000339401 The cost savings have been used by NCI to fund other strategic initiatives including futher network modernization.  both 0 Gross 0 Gross 0 Gross 4.524 Gross 6.260 Gross 7.250 Gross 0 Gross 0 Gross 0 Gross 0 Gross
317 Desktop Refresh Program 9/30/2015 Other 009-000339399 The cost savings have been used by NCI to fund other strategic initiatives including futher network modernization.  both 0 Gross 0 Gross 0 Gross 0 Gross 2.310 Gross 2.970 Gross 0 Gross 0 Gross 0 Gross 0 Gross
318 Service Automation (Engineering Efforts) 9/30/2014 Other NA The cost savings have been used to fund additional Engineering efforts to create additional efficiency within NCI. both 0 Gross 0 Gross 0 Gross 4 Gross 6.055 Gross 9.174 Gross 0 Gross 0 Gross 0 Gross 0 Gross
319 NIAID’s Integrated Contract Management Suite 10/1/2016 Other 009-000326389 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 4.000 Gross 7.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
320 NIAID Property Management Portal (NPMP) 4/1/2017 Other 009-000326389 The cost savings is recognized by NIH Institutes and HHS OPDIVS. How the savings is used or reinvested is not available to us. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 10.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
321 Office 365 10/1/2016 Digital Services 009-000006263 Savings will be reinvested towards local facility needs identified by local leadership and the health board. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.300 Gross 1.700 Gross 0 Gross 0 Gross 0 Gross 0 Gross
322 E-Prescribing of Controlled Substances (EPCS) 3/1/2017 Digital Services 009-000001362 Substance Abuse Training for Opioid Related  Activities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.070 Gross 0 Gross 8.000 Gross 0 Gross 0 Gross
323 RDS Device trade for RDS User CALS 1/29/2018 Commodity IT 009-000006263 Savings will be reinvested towards local facility needs identified by local leadership. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.119 Gross 0 Gross 0 Gross 0 Gross 0 Gross
324 DCOI Colocation Savings (Admin) 1/1/2015 Data Center 009-000001039 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Net 0.218 Net 0.218 Net 0.218 Net 0 Gross 0 Gross 0 Gross
325 DCOI Colocation Savings (Internet) 1/1/2015 Data Center 009-000355225 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Net 0.073 Net 0.073 Net 0.073 Net 0 Gross 0 Gross 0 Gross
326 CBHSQ ArcGIS License Termination 1/29/2018 Software License Management 009-000350589 Used for business programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Net 0.010 Net 0 Gross 0 Gross 0 Gross
327 Business process reengineering - Structured reporting for BPHC staff and Grantees 11/15/2011 Other 009-000276109 Resultant savings began in FY12 at $2.1M per year; the money was reinvested to continue automating additional BPHC business processes cost-avoidance 2.1 Gross 2.1 Gross 2.1 Gross 2.1 Gross 2.100 Gross 2.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross
328 Technology Modernization of BPHC program specific application system (GAAM) 11/15/2012 Other 009-000276109 Resultant savings began in FY13 at $217,800 per year; the money was reinvested to continue modernizing technology in BHCMIS modules cost-avoidance 0 Gross 0.218 Gross 0.218 Gross 0.218 Gross 0.218 Gross 0.218 Gross 0 Gross 0 Gross 0 Gross 0 Gross
329 Business Process efficiency - Program Oversight and Monitoring 11/15/2014 Other 009-000276109 Resultant savings began in FY15 at $988K per year; the money was reinvested to continue adding functionality to the new POM module cost-avoidance 0 Gross 0 Gross 0 Gross 0.988 Gross 0.988 Gross 0.988 Gross 0 Gross 0 Gross 0 Gross 0 Gross
330 Business Process efficiency - BHCMIS 2.0 Team Based Approach and Open Access 11/15/2014 Other 009-000276109 Resultant savings began in FY15 at $3.6M per year; the money was reinvested to continue enhancing BHCMIS modules to meet BPHC business needs cost-avoidance 0 Gross 0 Gross 0 Gross 3.6 Gross 3.600 Gross 3.600 Gross 0 Gross 0 Gross 0 Gross 0 Gross
331 Business procress reenginering - Consolidation of LAL program processes into Health Center program 11/15/2015 Other 009-000276109 Resultant savings began in FY16 at $250K per year; the money is being reinvested to complete LAL alignment with H80 functionality in the system cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Gross 0.250 Gross 0 Gross 0 Gross 0 Gross 0 Gross
332 Business process reengineering - CIS process streamlining for grantees and BPHC staff 11/15/2016 Other 009-000276109 Resultant savings occurred in FY17; the money will be reinvested to streamline additional BHCMIS functions for grantees and BPHC staff cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.680 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
333 eRwin Software Licenses 6/1/2016 Software License Management 009-000325773 Software Licenses were consolidated and repurposed to reflect a savings overall in FY16.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.037 Net 0 Gross 0 Gross 0 Gross 0 Gross
334 FAC P/PM Training 9/30/2015 Other NA While supporting & awaiting HHS award of vehicle, FDA engaged in providing various classes, achieving savings through economies of scale.  Savings redirected by leadership for re-use. cost-avoidance 0 Gross 0 Gross 0 Gross 0.119 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
335 Information Technology & Program Management Support Services 9/30/2015 Other NA Leadership had recently executed a reorganization so savings was redirected to other needs. cost-savings 0 Gross 0 Gross 0 Gross 1.71 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
336 Master Scheduler Tool Set 9/30/2016 Other NA Through analysis of  available tools, savings was achieved and rerouted for leadership re-use. cost-avoidance 0 Gross 0 Gross 0 Gross 0.1 Gross 0.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
337 Mathematica 9/30/2016 Software License Management 009-000325773 Software license savings achieved by repurposing of licenses already purchased.  Savings were swept back for leadership re-use. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.036 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
338 ORACLE Contract Consolidation 9/30/2016 Software License Management 009-000325773 Contractual consolidation resulted in contract savings.  Remaining funds were swept for leadership re-use. cost-savings 0 Gross 0 Gross 0 Gross 0.888 Gross 0.624 Gross 0.500 Net 0 Gross 0 Gross 0 Gross 0 Gross
339 Strategic Planning & PMO Support 9/30/2015 Other NA Leadership had recently executed a reorganization so savings was redirected to other needs. cost-savings 0 Gross 0 Gross 0 Gross 0.835 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
340 WinZip Licenses 9/30/2015 Software License Management 009-000325773 Reduce operational and future refresh costs by reducing the number of WINZIP licenses on duplicate machine names. Cost Savings were swept for leadership re-use.  cost-savings 0 Gross 0 Gross 0 Gross 0.013 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
341 Data Center Contracts Recompete Savings 8/1/2014 Data Center 009-000325771 Savings were reinvested in IT innovations and partially distributed back to FDA Programs cost-savings 0 Gross 0 Gross 0 Gross 20 Net    0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
342 Electronics Submissions Gateway (Shipping Savings Costs per Number of submissions) 8/1/2011 Other 009-000005326 Avoidance is reflected on regulated Industry savings cost-avoidance 11.5 Gross 14.8 Gross 17.4 Gross 25.6 Gross 32.100 Gross 33.500 Gross 0 Gross 40.000 Gross 0 Gross 0 Gross
343 Electronics Submissions Gateway Receipt Savings Costs per Number of Submissions 8/1/2011 Other 009-000005326 Calendar Year saving are program savings and have been redirected to other program areas cost-savings 42 Gross 53.7 Gross 63.39 Gross 93.03 Gross 116.870 Gross 121.660 Gross 0 Gross 145.300 Gross 0 Gross 0 Gross
344 Automation savings from the implementation of REQUEST-IT (automating Manual processes) 8/1/2013 Other 009-000005322 Savings have been allocated to support increased demand for the service. cost-avoidance 0 Gross 0 Gross 4.84 Gross 4.84 Gross 4.840 Gross 4.840 Gross 1.210 Gross 0 Gross 0 Gross 0 Gross
345 Automation Savings as a result of using Puppet to automate deployment into the data center 8/1/2016 Data Center 009-000325771 Savings have been reinvested to support the increase of software deployments cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.822 Gross 0 Gross 0 Gross 0 Gross 0 Gross
346 Servers Decommission 10/1/2015 Data Center 009-000325771 Savings were redirected to support other OIMT funding requirements cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 9.757 Gross 0 Gross 0 Gross 0 Gross 0 Gross
347 Retirement of DPRF (IT system) CDER 9/30/2015 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross 0.030 Gross 0.032 Gross 0.033 Gross 0.034 Gross 0.018 Gross
348 Retirement of DRLS (IT system) CDER 9/30/2015 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.024 Gross 0.024 Gross 0.024 Gross 0.025 Gross 0.026 Gross 0.013 Gross
349 Retirement of EES (IT system) CDER 9/30/2015 Other 009-000318788

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.246 Gross 0.253 Gross 0.260 Gross 0.268 Gross 0.276 Gross 0.142 Gross
350 Retirement of LIRA (IT system) CDER 9/30/2015 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 2.083 Gross 2.145 Gross 2.208 Gross 2.274 Gross 2.342 Gross 1.206 Gross
351 Retirement of SPOTS (IT system) CDER 9/30/2015 Other 009-000318788

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0.584 Gross 0.602 Gross 0.620 Gross 0.639 Gross 0.658 Gross 0.339 Gross
352 Shared Service Re-Use 3/31/2015 Other 009-000001462 Partner agencies no longer have to sustain the large overhead costs associated with developing and maintaining their own grants management services.  These savings can be re-invested into their mission services. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 108.761 Gross 145.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
353 Data Access Portal Application Development 4/14/2016 Other NA Reducing staff time needed to process manual submissions frees up resources to work on other Portal initiatives cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.019 Gross 0.019 Gross 0.021 Gross 0.021 Gross 0.021 Gross
354 Convert FIDM submission files from CD Rom to sFTP 4/1/2014 Other NA Reduction in manual processing time; frees up resources for other initiatives and O&M activities cost-avoidance 0 Gross 0 Gross 0.016 Gross 0.021 Gross 0.025 Gross 0.029 Gross 0.029 Gross 0 Gross 0 Gross 0 Gross
355 Reduce outreach staff from O&M contract and convert task to FFP 2/1/2016 Other NA Cost savings realized under new contract structure were reallocated to new development initiatives cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0.483 Gross 0 Gross 0 Gross 0 Gross
356 Develop an application to allow electronic transmission of Income Withholding Orders between State Child Support Agencies and Employers 3/1/2008 Other NA Cost avoidance is realized in terms of reduced Federal Financial Participation in State Child Support Administration expenses.  It costs significantly less (approximately $1 per IWO) to send the withholding form electronically than it does to print and mail it.  The Federal Government's share of this is 66%. cost-avoidance 0.313 Net 0.544 Net 0.74 Net 0.989 Net 1.011 Net 1.123 Net 1.216 Gross 1.925 Gross 1.866 Gross 2.057 Gross
357 Office of the Secretary Data Center Outsourcing (Triple-I) 10/1/2012 Data Center 009-000006266 NA cost-avoidance 5.937 Gross 6.703 Gross 7.404 Gross 8.113 Gross 9.074 Gross 8.976 Gross 2.244 Gross 0.561 Gross 0 Gross 0 Gross
358 Data Center Consolidation 9/30/2011 Data Center 009-000001462 These savings can be re-invested into other mission services. cost-savings 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0.822 Gross 0 Gross
359 ATO GS-COE Cost Avoidance 9/30/2015 Data Center 009-000001462 These savings can be re-invested into other mission services. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 1.680 Gross 1.680 Gross 1.680 Gross 1.680 Gross 1.680 Gross 0 Gross
360 Business Intelligence Enterprise Softwareware Soluition 3/15/2018 Software License Management 009-000001359 Savings will be reinvested in other Business Intelligence Capabilities  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.800 Gross 0 Gross 0 Gross 0 Gross
361 EDPS Transition to Nextgen 9/17/2018 Other 009-000006796 Transitioned to a new system at less than the average cost of existing system.  Avoided costs used for other operational needs. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.500 Gross 0 Gross 0 Gross
362 NDW hosting 9/15/2017 Data Center 009-000001474 Transitioned hosting for National data Warehouse to the VDC IDIQ.  Avoided costs used for other operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.100 Net 2.600 Net 0 Gross 0 Gross
363 New Relic  and F5 Software savings 9/1/2016 Software License Management 009-000316812 CMMI Savings used for other needs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.186 Gross 0 Gross 0 Gross 0 Gross 0 Gross
364 NGINX and SQL Server license 8/15/2015 Software License Management 009-000316812 CMMS Savings used for other needs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0.093 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross
365 CMS WAN Services 1/1/2017 Other 009-000006265 IUSG continues to seek opportunities to reduce costs for CMS WAN services that are no longer required.  Savings are used for other operational needs/priorities.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.731 Gross 0.023 Gross 0 Gross 0 Gross 0 Gross
366 Telecommunication Voice Services 1/1/2013 Other 009-000006265 IUSG continues to seek opportunities to reduce costs for CMS Telecommunciation voice services that are no longer required.  Savings are used for other operational needs/priorities.  cost-savings 0.082 Gross 0.138 Gross 0.001 Gross 0.057 Gross 0.003 Gross 0.060 Gross 0 Gross 0 Gross 0 Gross 0 Gross
367 NREPP Contract Termination 1/8/2018 Other 009-000003975 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.422 Net 0 Gross 0 Gross 0 Gross
368 BASCIC Contract Termination 4/30/2018 Other 009-000410304 Non-expiring find, return to treasury cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.000 Net 0 Gross 0 Gross 0 Gross
369 NIH IT Data Centers and Cloud Services - Cloud adoption 9/30/2014 Data Center 009-000339398 The cost savings is recognized by NIH Institutes. How the savings is used or reinvested is not available to us. cost-savings 0 Gross 0 Gross 0 Gross 0.097  Gross  0.360  Gross  0.371 Gross 0 Gross 0 Gross 0 Gross 0 Gross
370 NIH IT End User Devices, Tools & Support - Cloud adoption 9/30/2016 Data Center 009-000339399 The cost savings is recognized by NIH Institutes. How the savings is used or reinvested is not available to us. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.350 Gross 0 Gross 0 Gross 0 Gross 0 Gross
371 NIH NHLBI Administration and Management Support Applications and Tools - Cloud adoption 9/30/2014 Data Center  
009-000326445
 Cost savings were used to fund other IT investments used to further reduce overhead and improve efficiency. cost-savings 0 Gross 0 Gross 0 Gross 0.051  Gross  0.051  Gross  0.051 Gross 0 Gross 0 Gross 0 Gross 0 Gross
372 NIH NIAID Sci Mission Biomedical Data Repositories & Analytical Tools - Cloud ad 9/30/2016 Data Center 009-000326386  Cost savings were used to fund other IT investments used to further reduce overhead and improve efficiency. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross
373 NIH NIAID Sci Mission Extramural Research Management and Support Tools 9/30/2016 Data Center  








009-000326450

 Cost savings were used to fund other IT investments used to further reduce overhead and improve efficiency. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Gross 0 Gross 0 Gross 0 Gross 0 Gross
374 Help Desk Consolidation 7/1/2017 Commodity IT NA Savings were reinvested into upgrading network performance and resiliency cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.700 Gross 0 Gross 0 Gross 0 Gross
375 Office of the Secretary Data Center Outsourcing (Sev1Tech) 3/27/2018 Data Center 009-000006266 NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.590 Gross 1.147 Gross 0 Gross 0 Gross
376 MobilePaaS DME cancellation 7/8/2018 Other 009-000001039 Used for business programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Net 0 Gross 0 Gross 0 Gross
377 Cancellation of Platform for Records Management Training 7/8/2018 Other 009-000350149 Used for business programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.150 Net 0 Gross 0 Gross 0 Gross
378 Information Technology Clearance Process (SAS licenses) 6/29/2018 Software License Management 009-000003981 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.021 Net 0 Gross 0 Gross 0 Gross
379 AWS virtual server management 9/1/2018 Data Center 009-000350589 To be determined by the Contracting Officer cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.007 Net 0.007 Net 0 Gross 0 Gross
380 Termination-Recovery to Practice (RTP) 10/1/2019 Other 009-000410121 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.038 Net 0 Gross 0 Gross
381 Termination-PROJECT LAUNCH - Training and Technical Assistance Center 10/1/2019 Other NA Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.361 Net 0 Gross 0 Gross
382 Termination-Clinical Technial Assistance - SBIRT 10/1/2019 Other 009-000002231 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Net 0 Gross 0 Gross
383 Termination-Now is the Time Technical Assistance (NITT TA) 10/1/2019 Other 009-000350639 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.165 Net 0 Gross 0 Gross
384 Termination-Addressing Opioid-related Misuse and Overdose (AOMO) 10/1/2019 Other 009-000410092 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.009 Net 0 Gross 0 Gross
385 Termination-Clinical Technical Assistance -PPW 10/1/2019 Other 009-000410118 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.041 Net 0 Gross 0 Gross
386 Termination-Clinical Technical Assistance - TCE TAC 10/1/2019 Other 009-000410090 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.340 Net 0 Gross 0 Gross
387 Termination-Clinical Technical Assistance - CJ 10/1/2019 Other 009-000410116 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.059 Net 0 Gross 0 Gross
388 Termination-Children's Mental Health Social Marketing Technical Assistance 10/1/2019 Other 009-000350641 Used for grants programs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.008 Net 0 Gross 0 Gross
389 Digital Services Center 9/28/2017 Digital Services NA Leveraged shared enterprise PaaS/SaaS environments to develop, deploy & support IT solutions in a rapid agile methodology providing best practices, guidance and cost reduction of O&M support, Salesforce/Appian license consolidation and eliminating additional contracting actions and dollars that would have been required to separately host and support FDA applications.

both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.250 Gross 0 Gross 0.250 Gross 0 Gross 0 Gross
390 DevOps 9/28/2017 Digital Services NA Centralized managed solution providing a standardized approach to managing and securing development of FDA applications with ease of integration, more reliable, quicker to release, and more secure via open source technology both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.050 Gross 0 Gross 0 Gross 0 Gross 0 Gross
391 ELEXNET data center migration  7/30/2018 Other NA Savings were redirected to support other ORA funding requirements cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.688 Gross 0.375 Gross 0 Gross
392 Information Technology Clearance Process: Software discount 12/26/2018 Software License Management 009-000001417 Used for business programs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.052 Net 0 Gross 0 Gross
393 Records management uses PSC a shared service and avoid purchasing Kofax Cloud PaaS 8/31/2018 Other 009-000350149 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.090 Net 0 Gross 0 Gross
394 Use an open source search engine SOLR which is free 12/1/2018 Other 009-000001039 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.010 Net 0 Gross 0 Gross
395 Current staff was able to perform the software (Tm1) upgrade themselves without the need for planned additional support 12/1/2018 Other 009-000001039 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.128 Net 0 Gross 0 Gross
396 Termination of Extranet developmnet for external partners 7/9/1905 Other 009-000001039 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.465 Net 0 Gross 0 Gross 0 Gross
397 Termination of Q application developmnet for SAMHSA publications and brochures clearance workflow 7/9/1905 Other 009-000001039 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.367 Net 0 Gross 0 Gross 0 Gross
398 Termination of HIRE application development for Human Resource management 7/9/1905 Other 009-000001039 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.471 Net 0 Gross 0 Gross 0 Gross
399 Used HHS Shared Service to replace Ethos application for ethics program managemnt 7/9/1905 Other 009-000001039 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.114 Net 0 Gross 0 Gross 0 Gross
400 MIG Disposition 8/15/2018 Other 009-000006171 Savings used for other operational priorities.System to be decommissioned as of 10/31/2018. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.000 Gross 0 Gross 0 Gross
401 Marketplace Service Desk 3/19/2018 Other NA Savings used for CCIIO's Cloud Migration project cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross 0.500 Gross 0 Gross 0 Gross
402 Salesforce Savings (36 new apps were delivered via Salesforce, building separate tools would have cost an additional $1.5M per instance) 11/2/2018 Other 009-000316812 CMMI Savings used for other needs. both 0 Gross 0 Gross 0 Gross 0 Gross 40.000 Gross 54.000 Gross 0 Gross 0 Gross 0 Gross 0 Gross
403 IC Landing Page Savings (14 new models were integrated through IC, otherwise we would have spent $500K per instance for direct EIDM integration) 11/2/2018 Other 009-000316812 CMMI Savings used for other needs. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.000 Gross 0 Gross 0 Gross 0 Gross
404 Reusable Framework Savings (6 models are in RF, this avoided $2M in additional cost per instance) 11/2/2018 Other 009-000316812 CMMI Savings used for other needs. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 12.000 Gross 0 Gross 0 Gross 0 Gross
405 Medicare Secondary Payer Recovery 6/12/2012 Other 009-000314838 MSP and COB program uses both cost savings and cost avoidance to continue to protect the Medicare Trust Fund through the prompt recovery of payment where Medicare should have not been primary and timely coordination of benefits.  both 7.863 Gross 8.926 Gross 8.2 Gross 8.491 Gross 8.660 Gross 8.510 Gross 8.849 Gross 0 Gross 0 Gross 0 Gross
406 HIGLAS Oracle Software Licenses 4/11/2018 Other 009-000001468 The result of using a different contract vehicle for the annual renewal of Oracle licenses for the HIGLAS program. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.084 Gross 0 Gross 0 Gross 0 Gross
407 HIGLAS Exadata Hardware 5/15/2018 Other 009-000001468 The result of procuring hardware as government furnished equipment rather than having a contractor purchase it. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Gross 0 Gross 0 Gross 0 Gross
408 Oracle 5/1/2019 Software License Management NA Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.375 Gross 0 Gross 0 Gross
409 Consolidate Informatica Software purchase 2/1/2018 Software License Management NA Consolidate purchase of Informatica licenses into one acquistion vehicle cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Gross 0.100 Gross 0 Gross
410 Agency Wide Tableau Contract 2/1/2017 Software License Management NA Established Agency wide Tableau Contract cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.032 Gross 0.016 Gross 0 Gross
411 Used a low price solution for Software Tracking system (ManageEngine) 10/1/2019 Other 009-000001039 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.146 Net 0 Gross 0 Gross
412 Used alternate solution to do source code scanning (Fortify) 10/1/2019 Other 009-000004027 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.032 Net 0 Gross 0 Gross
413 Alternative to security software (SafeBreach not renewed) 10/1/2019 Other 009-000004027 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.088 Net 0 Gross 0 Gross
414 Self support on MindBreeze professional (using Open source solution) 10/1/2019 Other 009-000001039 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.010 Net 0 Gross 0 Gross
415 Alternative to security software (Anisible not renewed) 10/1/2019 Other 009-000004027 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.011 Net 0 Gross 0 Gross
416 Alternative to security software (Bitsight not renewed) 10/1/2019 Other 009-000004027 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Net 0 Gross 0 Gross
417 Alternative to project management (using desktop MS Project)  10/1/2019 Software License Management 009-000001039 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.031 Net 0 Gross 0 Gross
418 ServiceNow Licenses 9/1/2017 Software License Management NA In FY16 FDA spent 2.8M to procure ServiceNow licenses. Vendor had quoted 7% increase and we had FY17 budget approved for 3.0M. However to achieve cost savings in support of request to reduce Fiscal Year 2017 (FY17) costs by ~10%- we negotiated with vendor and kept the licensing cost to 2.8M . In the process saving approximately 200K. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Gross 0 Gross 0 Gross 0 Gross 0 Gross
419 DB2 Contract Award 3/28/2019 Other 009-000000704 Used for other priorities cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.530 Gross 0 Gross 0 Gross
420 DDPS Re-compete 6/1/2019 Other 009-000004260 Used for other priorities cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.549 Gross 0 Gross 0 Gross
421 Demonstration Payment System (DPS) 1/1/2018 Other 009-000406217 Demonstration Payment contract not renewed due to an efficiency process improvement Strategy . The team decommissioned the Mainframe Demonstration Payment System(DPS) and Transitioned to the HIGLAS  WebADI system/process for making Demonstration payments.  Savings are used for  other operational needs/priorities. both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.435 Gross 0.485 Gross 0 Gross 0 Gross
422 HIPAA Eligibility Transaction System (HETS) Independent Testing Contractor Contract Award 5/30/2019 Other 009-000004414 Used for other priorities cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.135 Gross 0 Gross 0 Gross
423 Security Countract Savings 10/1/2019 Other 009-000004027 Used for future business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.138 Net 0 Gross 0 Gross
424 Alternative to file transfer (using FileCloud instead of Hard Drives) 11/6/2019 Other 009-000004001 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.0005 Gross 0 Gross 0 Gross
425 AWS Saving ( termination of server after business hours)  11/6/2019 Other 009-000350589 Used for future business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.105 Net 0 Gross 0 Gross
426 Security Software (No renewal of ForgeRock) 11/6/2019 Other 009-000004027 Used for future business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Net 0.022 Net 0 Gross
427 Help Desk Savings (received discount from ITIO) 11/6/2019 Other 009-000005277 Used for future business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Net 0.020 Net 0 Gross
428 AWS Assesment Cost Avoidance (found free assssment from Amazon)  11/6/2019 Other 009-000350589 Used for future business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Net               0.0070 Net 0 Gross
429 BRES system decommissioned 10/31/2018 Other 009-000314918 Used for other priorities cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.807 Gross 0 Gross 0 Gross
430 PQRS functionality rolled into QPP 8/13/2018 Other 009-000348474 Used for other priorities both 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 28.392 Net 5.800 Gross 0 Gross
431 MIG system decommissioned 10/31/2018 Other 009-000006171 Used for other priorities cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.075 Gross 1.000 Gross 0 Gross
432 Retiree Drug Subsidy (RDS):  All Program Applications Migrated to the CMS AWS Cloud Enclave (implemented December, 2018) 9/14/2017 Data Center 009-000002476 Cost savings realized by operating in the CMS AWS Cloud Enclave, instead of in two external data centers which had been previously shared by 3 programs.  Savings used for RDS Secure Website (SWS) re-design utilizing Human-Centered Design techniques; Appeals, Payment, and Operations Technical Support process and support system improvements; and other operational needs/priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.074 Gross 0 Gross 0 Gross
433 Retiree Drug Subsidy (RDS):  Decommissioned 2 External Data Centers 9/14/2017 Data Center 009-000002476 Completely decommissioned 2 external RDS data centers, AT&T in NYC and Warrenton, VA, made possible by the migration of all program applications to the CMS AWS Cloud Enclave; implementation completed July 2019.  Avoided increased costs of $2.2M/year for sole tenancy in two external data centers which had been previously shared by 3 programs. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.200 Gross 0 Gross 0 Gross
434 Retiree Drug Subsidy (RDS):  Elimination of Oracle Software Support Licenses (CMS ELA) for the two external hosted data centers (decommissioned) 9/6/2017 Software License Management 009-000002476 Savings used for RDS Secure Website (SWS) re-design utilizing Human-Centered Design techniques; Appeals, Payment, and Operations Technical Support process and support system improvements; and other operational needs/priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.019 Gross 0 Gross 0 Gross
435 Retiree Drug Subsidy (RDS):  Replacement of IBM Software Support Licenses with CMS ELA 9/11/2017 Software License Management 009-000002476 Replaced contractor-held IBM Software Support Licenses in 2018 and 2019 with CMS ELAs.  Savings used for RDS Secure Website (SWS) re-design utilizing Human-Centered Design techniques; Appeals, Payment, and Operations Technical Support process and support system improvements; and other operational needs/priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.446 Gross 0.446 Gross 0 Gross 0 Gross
436 Retiree Drug Subsidy (RDS):  Replacement of contractor-held Informatica Software Support Licenses with existing CMS License Agreement 8/11/2017 Software License Management 009-000002476 Savings used for RDS Secure Website (SWS) re-design utilizing Human-Centered Design techniques; Appeals, Payment, and Operations Technical Support process and support system improvements; and other operational needs/priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.007 Gross 0.096 Gross 0 Gross 0 Gross
437 Medicare Advantage (MA) Encounter Data Dashboard and Analytics (EDDA) Contract- Selection of lower cost bid 8/11/2019 Other 009-000436966  For the total contract value (without transitioning), Proposal A was $7.6M, proposal B was $6.3M.  The TEP selected proposal B.  The result is 1.3M in cost avoidance over the years of the contract (Base+4 option years). Savings used toward other operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.260 Gross 0.260 Gross 0 Gross
438 Medicare Advantage (MA) Encounter Data Dashboard and Analytics (EDDA) Contract- new contract is lower cost for same services. 8/11/2019 Other 009-000436966 We projected and allocated $2.1M for the base year; but the contract came out to be $1.8M for the base year resulting in 300K of savings. The 1.8M is also lower than the value of the previous option year before it which was $2M. Savings used for other operational priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0 Gross 0 Gross
439 Customer Service Front End System (CSFES) for Processing Part C Encounter Data, Part C and Part D Risk Adjustment Processing System (RAPS) Data, Part D Prescription Drug Event (PDE) Data, and Medicare Medicaid Plan (MMP) Encounter Data Contract 9/13/2019 Other 009-000281595 The cost of the previous contract was $13.2 million and the cost of the new contract is $9.2 million. We are receiving identical services (value) as the previous contract.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.800 Gross 0.800 Gross 0 Gross
440 Beneficiary Claims Data API
The reuse of the BB2.0 Beneficiary FHIR Data Server (BFD) eliminated the need for a separate data respository resulting in a cost-avoidance of $1.6M.
6/1/2018 Other 009-000428405 Savings used toward operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.600 Gross 0 Gross 0 Gross
441 Data at the Point of Care
The reuse of the BB2.0 Beneficiary FHIR Data Server (BFD) eliminated the need for a separate data respository resulting in a cost-avoidance of $1.6M.
2/1/2019 Other 009-000428405 Savings used toward operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.600 Gross 0 Gross 0 Gross
442 Medicare Part A & B Data to PDP Sponsors
The reuse of the BB2.0 Beneficiary FHIR Data Server (BFD) eliminated the need for a separate data respository resulting in a cost-avoidance of $1.6M.
5/1/2019 Other 009-000428405 Savings used toward operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.600 Gross 0 Gross 0 Gross
443 Scope Reduction of CCSQ Infrastructure Option year 4 contract 7/1/2019 Other Multiple Savings used for higher value work and modernization efforts. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 35.000 Gross 0 Gross 0 Gross
444 CCSQ's agile methodologies reduced need for project managment contract by 40 people 7/1/2019 Other Multiple Savings used for higher value work and modernization efforts. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 3.300 Gross 0 Gross 0 Gross
445 CCSQ reduced independent tetsing contract by using automation and embedding testers on sprint teams. 7/1/2019 Other Multiple Savings used for higher value work and modernization efforts. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 10.300 Gross 0 Gross 0 Gross
446 CCIIO general program support services contract 8/1/2019 Other 009-000267389 Contract re-competed wtith new SOW and contract type.  Competitive source selection resulted in savings.  Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.793 Gross 0 Gross 0 Gross
447 CCIIO Marketplace Systems Integrator software license consolidation 7/23/2019 Software License Management 009-000267389 As part of cloud migration project, consolidated licenses used by Application Development Organizations.  Some planned costs in option year were not incurred.  Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 10.215 Gross 0 Gross 0 Gross
448 CCIIO Cloud Computing Services 6/22/2019 Other 009-000267389 Re-pricing of cloud computing services (right-sizing after cloud migration) reduced funding needed.  Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 38.600 Gross 0 Gross 0 Gross
449 CCIIO MLMS software consolidation 12/31/2018 Software License Management 009-000267389 Software consolidation enabled less funding to be used on MLMS.  Savings used for other priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.378 Gross 0 Gross 0 Gross
450 OACT replaced Intercall contract with Webex for large conference calls for bid calls
12/11/2019 Other NA By using the updated Webex for large conference calls, OACT avoided having to use contract funds to secure Intercall- allowing funds to be used for other priorities.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.011 Gross 0 Gross 0 Gross
451 Move to SAS Viya ELA from SAS 9.4
1/12/2020 Software License Management Multiple Reduced Licensing cost for SAS products by leveraging lower cost products on and enterprise lisensing agreement.  Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.600 Net 0 Gross
452 ESSG/DMSS independent testing contract was eliminated 1/1/2020 Other Multiple Multi-system independent testing contract ended and activities rolled into modernized agile sdlc. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.000 Gross 0 Gross
453 CBO/CSR Retirement 1/1/2020 Other 009-000236620 Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.180 Gross 0 Gross
454 OC/WETG AWS Reserve Instance purchase 5/1/2019 Other Multiple The purchase of Reserve Instances enabled us to cut back on high usage costs.  Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.600 Gross 0 Gross
455 OC/WETG Blast Services 9/1/2019 Software License Management Multiple Cutting back on the Blast Professional service hours enabled a cost savings of $557,040.  Savings used for other operational priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.557 Gross 0 Gross
456 Option Year 4 of CCW Contract  1/10/2019 Software License Management 009-000339370 De-scoped contract to remove CMMI SAS licenses costs covered by OIT. Savings used for other CMMI operational needs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.350 Net 0 Gross 0 Gross
457 Option Year 5 of CCW Contract  12/12/2019 Other 009-000339370 De-scoped CMMI requirements to remove specialized analytic and technical support for the State Innovation Model. Savings used for new CMMI model VRDC access and development needs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.000 Gross 0 Gross
458 Migrated from using the proprietary Oracle database software to using open-source PostgreSQL one year earlier (BHSIS) 2/19/2020 Other 009-000001417 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross 0 Gross 0 Gross 0 Gross 0 Gross
459 Moving to the SAMHSA GovCloud (OTP EXTRANET) 2/19/2020 Data Center  
009-000006223
To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.120 Gross 0 Gross
460 Reduce IT costs and supports associated due to some work was not requested by SAMHSA( BRSS TACS) 2/19/2020 Other  
009-000409350
To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.173 Gross 0 Gross 0 Gross
461 Using Sharepoint Service 2/20/2020 Other 009-000350589 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.050 Gross 0 Gross
462 Using Endnote X9  2/20/2020 Other 009-000350589 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross 0 Gross
463 Using laptop refresh share service (ITIO)  2/20/2020 Other 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.000 Gross 0 Gross
464 HHS BPA Cost Avoidance 6/20/2019 Software License Management 009-000439257 Using HHS BPA  provided cost avoidances on the annual customer relationship software licenses and platform cost. These davings can be re-invested into other mission serivces. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 19.000 Gross 0 Gross
465 AFCARS and FFPSA Acquisitions 6/20/2019 Other 009-000451592 In planning for the AFCARS and FFPSA IT Solutions it was determined that both solutions compliment one another. By joining two acquisition teams together cost-avoidance was created. These savings can be re-invested into other mission services. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.542 Gross 0 Gross
466 CWF PSO 9/12/2019 Other 009-000004253 Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross 0 Gross
467 IHCCS PSO 9/19/2019 Other Multiple Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.135 Gross 2.369 Gross 0 Gross
468 IHCCS PSO 11/14/2019 Other Multiple Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.360 Gross 18.172 Gross 0 Gross
469 IHCCS PSO 12/23/2019 Other Multiple Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.650 Gross 0 Gross
470 Cloud IT Operations PSO 9/12/2019 Other 009-000420050 Used for other priorities cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.386 Gross 0 Gross
471 Consolidation of Help Desk clins 6/1/2018 Other 009-000316812 Savings used for other needs. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 6.095 Net 0 Gross 0 Gross
472 Retirement of PQP Mobility (IT system) CDER 10/1/2018 Other 009-000338730 Reinvested funds into FDA CDER Marketplace for Regulatory Data cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.420 Gross 0.433 Gross 0.223 Gross
473 HHS Vmware Enterprise Agreement 1/31/2020 Data Center 009-000407142 Resultant savings of FY20 funding of $119k for Vmware maintenance.  Annually the mainteance increases to to previous procurements that had multiyear maintenance included and we have been adjusting our budget accordingly.  To cover the maintenance in FY20 we were originally short the funding and would have had to re-allocate funding but will not need to do this now.  We also are able to budget more accurately FY21 for VMware maintenance.  cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.119 Gross 0 Gross
474 Removal of Kofax Standard Support software 6/12/2020 Software License Management 009-000349487 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.043 Gross 0 Gross
475 Moving to the SAMHSA GovCloud (OTP EXTRANET) 6/12/2020 Data Center  009-000006223 To be determined by the Contracting Officer cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.120 Gross 0 Gross
476 Removal of Mindbreeze Solfware 6/12/2020 Software License Management 009-000349487 Used for other business needs cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.054 Gross 0 Gross
477 Cancellation of Informatica Power Center 6/12/2020 Software License Management 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.054 Gross 0 Gross
478 Cancellation of Manage Engine Password Mgr Pro 7/12/2020 Data Center 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.004 Gross 0 Gross
479 Cancellation of Agile Survey (5-star) 7/12/2020 Digital Services 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross 0 Gross
480 Cancellation of Vmware - 2 addtl units 9/10/2020 Data Center 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.008 Gross 0 Gross
481 Beyond Compare 7/10/2020 Software License Management 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross 0 Gross
482 Barracuda WAF 5/31/2020 Data Center 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.033 Gross 0 Gross
483 Cancellation of Vmware - 8 addtl units 6/4/2020 Data Center 009-000349487 Used for other business needs cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.007 Gross 0 Gross
484 Gartner ELA 6/28/2020 Software License Management Multiple Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.650 Gross 0.486 Gross
485 Migration of CCIC to cloud 1/10/2020 Data Center 009-000006273 Savings used for other priorities.  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 8.000 Net 0 Gross
486 OCIO CDM IAA Procurements 10/1/2019 Other 009-000003943 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.089 Gross 0 Gross
487 HHS Protect was acquired via a negotiated acquisition off GSA Schedule. 4/8/2020 Sharing Quality Services NA HHS Protect was funded out of the Covid-19 Emergency appropriation.  Savings/cost avoidance will be used for the HHS Covid-19 response. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 17.430 Gross 0 Gross
488 Managed Trusted Internet Protocol Service (MTIPS):  OCIO created a cost estimate, published the RFI, and used the GSA EIS contract to get the most aggressive pricing. 3/23/2020 Commodity IT NA Funded by CARES Act (a.k.a., COVID-19) funding.  Savings/cost avoidance will be used for the HHS COVID-19 response. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 22.500 Gross 0 Gross
489 FY 2020 reductions in spending on maintenance spend plan line items  10/11/2020 Data Center NA NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.218 Gross 0 Gross
490 FY 2020 systems migration to AWS 10/11/2020 Data Center NA NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.100 Gross 0 Gross
491 Data Center Closure - residual avoidance 1/1/2020 Data Center NA NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 7.002 Gross 0 Gross
492 Linux Support Services 9/24/2020 Data Center NA NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 3.200 Gross 0 Gross
493 Cisco Enterprise License Agreement for SmartNet maintenance on Cisco hardware, in lieu of purchasing maintenance agreement for new hardware. 10/11/2020 Data Center NA NA cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.002 Gross 0 Gross
494 HHS VMWare ELA- OS Savings only 1/30/2020 Software License Management NA NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.474 Gross 0 Gross
495 Service Now ELA 7/15/2020 Software License Management Multiple Savings used for other priorities.  both  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.410 Gross 2.175 Gross
496 CMMI IDOS transition and base period (FFP and CPFF) replaces CICDIM (CPAF) 1/7/2019 Other 009-000316812 Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.968 Gross 0 Gross
497 CMMI IDOS transition and base period (FFP and CPFF) replaces CICDIM (CPAF) 1/7/2019 Other 009-000316812 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 10.076 Gross 0 Gross
498 CSTLTS System Retirements 1/2/2018 Digitial Services 009-000327722 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.227 Gross 0 Gross 0 Gross 0 Gross
499 NCEH System Retirements 10/1/2017 Other 009-000001555 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.117 Gross 0 Gross
500 NCHS System Retirements 11/9/2016 Other 009-000223535 NA cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.495 Gross 0 Gross
501 Re-allocation of Tableau licenses 2/2/2021 Software License Management Multiple Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross
502 Retract/reissue Gartner Licenses 1/29/2021 Software License Management Multiple Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.145 Gross
503 Roll EAs into HHS ELA 2/1/2020 Software License Management Multiple Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.024 Gross 0.084 Gross
504 Retiree Drug Subsidy (RDS):  Reduced Information Technology Operational Costs in the CMS AWS Cloud Enclave 1/1/2019 Data Center 009-000002476 Savings used for the modernization of the RDS Secure Website (SWS) via Human-Centered Design; the development of a new Appeals Decision Support system in program support; and enabled the program to react quickly to implement the CARES Act and Covid-19-related system changes.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.053 Gross 0 Gross
505 Encounter Data Processing System NextGen 9/1/2020 Other 009-000006796 Savings achieved via improvements and optimization used to fund other operational needs.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross 0 Gross
506 Beneficiary FHIR Data (BFD): Repository Reusability 1/10/2020 Other 009-000428405 Costs avoided by reuse of existing FHIR-based data respository to share data externally via API with partners were used for other priorities.   cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.500 Gross 1.500 Gross
507 System-to-System Authentication Service (SSAS): Credential Management 3/9/2019 Other 009-000420295 Savings achieved via re-use of authentication service were used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.050 Gross 0.025 Gross
508 Utilization of GSA Market Research Service (MRAS) to expedite procurement planning phase (reduction of approximately 50% of staff effort and length of time) 2/3/2021 Other Multiple Savings achieved by use of MRAs used for other operational needs.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross 0.006 Gross
509 Renegotiated Okta Licenses for Enterprise Identity Management 12/20/2020 Software License Management 009-000419507 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.288 Gross
510 PECOS 2.0 - CPI 8/4/2020 Other 009-000406263 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.923 Gross 0 Gross
511 National Plan and Provider Enumeration System (NPPES) - CPI 9/24/2020 Other 009-000406261 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.621 Gross 0 Gross
512 SharePoint Recompete 1/27/2020 Other 009-000282281 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.394 Gross 0 Gross
513 SharePoint Operations and Maintenance- use of ShareGate over AvePoint 1/28/2021 Other 009-000282281 Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.242 Gross 0 Gross
514 Appian License Task Order Award 8/31/2020 Software License Management NA Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.176 Gross 0 Gross
515 Adaptive Capabilities Testing Recompete 9/17/2020 Other 009-000006273 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.644 Gross 0 Gross
516 Value Based Care System Order- negotiated lower price 1/19/2021 Other 009-000316812 Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.303 Gross
517 Cloud Resources Management Task Order Award- negotiated lower price 8/27/2020 Other Multiple Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.322 Gross
518 Adobe Creative Cloud (all apps)-No renewal 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.002 Gross
519 Adobe Photoshop & Illustrator 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross
520 Kofax maintenance renewal 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.038 Gross
521 ManageEngine Password Manager-no renewal  2/10/2021 Data Center 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross
522 Microsoft Project Standard 2016 (FY19)-no renewal 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.010 Gross
523 Microsoft Visio 2013 Professional (not renewed) 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross
524 Microsoft Visio Standard 2016 (FY19)(not renewed) 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.047 Gross
525 Pkzip (not renewed) 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross
526 PrintFriendly & PDF Pro(has not been renewed) 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross
527 Project and Visio 2016 std 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.025 Gross
528 Project Online 2/11/2021 Data Center 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.031 Gross
529 SmartSheet 2/12/2021 Software License Management 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.022 Gross
530 SnagIt 2/10/2021 Software License Management 009-000349487 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross
531 Transition to SAMHSA Commercial Cloud (BHSIS) 2/10/2021 Data Center 009-000001417 To be determined by the Contracting Officer  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.092 Gross
532 HFPP migration to AWS 9/15/2020 Data Center 009-000448086 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.261 Gross 0.556 Gross
533 Innovation Payment Contract (IPC); TDL required VMware be purchased through HHS vehicle. 9/26/2020 Other 009-000316812 Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.014 Gross 0.014 Gross
534 Used CMS' Identity Management Solution to provide multi-factor authentication for CMMI' instance of SalesForce. 9/1/2020 Other 009-000316812 Savings used for other priorities.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.800 Gross 0 Gross
535 Reduced contract spending for PM management system (AMS) 11/20/2020 Other 009-000316812 Savings used for other priorities.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 4.900 Gross
536 British Pharmacopoeia 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.004 Gross
537 EBSCOhost 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.156 Gross
538 Alma Support and Maintenance 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.005 Gross
539 OIMT-OIS-Firewall Maintenance 9/14/2020 Data Center 009-000005321 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.200 Gross
540 OIMT-OIS Digital Investigation and eDiscovery Solution 9/14/2020 Other 009-000005321 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.017 Gross
541 Data Management and Governance 9/15/2020 Other 009-000005322 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.100 Gross
542 OIMT CPIC Oversight Support 9/11/2020 Other 009-000005322 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.131 Gross
543 SharePoint 2010 O&M 9/8/2020 Other 009-000325767 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross
544 Website Support and Hosting Services O&M 9/8/2020 Other 009-000325767 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.700 Gross
545 Drupal upgrade from Drupal 8 to Drupal 9 9/8/2020 Other 009-000325767 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.050 Gross
546 ScienceDirect 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.339 Gross
547 Copyright Clearance Center 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.270 Gross
548 Scientific Computing Data Loss Prevention 9/30/2020 Other 009-000333928 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.048 Gross
549 Erwin Collaboration Tools - FY21 9/30/2020 Other 009-000325773 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.031 Gross
550 Dell Chassis and Blade Hardware 9/30/2020 Other 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross
551 RDC Services and PC Installation Support 11/18/2020 Other 009-000325768 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.550 Gross
552 IT Helpdesk - Mid-Atlantic Support 9/14/2020 Other 009-000325768 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.990 Gross
553 Library Equipment 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.006 Gross
554 Electronic Funds Transfer (EFTS) University of CT 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross
555 Natural Medicines 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.022 Gross
556 Journal/Book Collection/Repairs 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross
557 Innovation Resources 12/2/2020 Other 009-000327772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.071 Gross
558 Innovation and Rapid Prototyping 12/2/2020 Other 009-000327772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 2.500 Gross
559 Monthly Recurring Telecom Bills - MAN WITS 12/1/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.013 Gross
560 Monthly Recurring Telecom Bills - Networx 12/1/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 3.300 Gross
561 Monthly Recurring Telecom Bills - OHR New York 12/1/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.010 Gross
562 Monthly Recurring Telecom Bills - Tariff-OHR San Francisco 12/1/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.032 Gross
563 Monthly Recurring Telecom Bills - PSC SF629 12/1/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.054 Gross
564 Acme Session Border Controller (SBC) Hardware and Maintenance Support 9/18/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.337 Gross
565 Unified Communications Support-Engineering Services 9/3/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.285 Gross
566 Riverbed Hardware Maintenance - Steel Heads & Cascade 9/30/2020 Data Center 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.017 Gross
567 EndNote 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.060 Gross
568 FDA Datacenter Facility Needs (flooring, battery replacements, power etc) 9/3/2020 Data Center 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross
569 WODC UPS. HVAC maintenance contract 9/30/2020 Data Center 009-000406177 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.033 Gross
570 Enterprise Application - SRP 9/9/2020 Other 009-000261566 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.632 Gross
571 Safety Reporting Portal (SRP) Hosting Services (AWS) 9/9/2020 Other 009-000261566 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.230 Gross
572 Symantec Support Renewal 12/1/2020 Software License Management 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.300 Gross
573 Tape Media 9/30/2020 Data Center 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.030 Gross
574 Varonis DatAdvantage Support Renewal 12/16/2020 Data Center 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.269 Gross
575 OCLC ILLiad 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.023 Gross
576 OCLC Cataloging & Resource Sharing 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross
577 JAADE Rebel Licenses 9/30/2020 Software License Management 009-000325773 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.007 Gross
578 Browzine 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross
579 Wall Street Journal Online 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.030 Gross
580 WhatsUp Gold Maintenance  12/3/2020 Other 009-000325771 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.002 Gross
581 Oracle Identity and Access Management (OIAM)/Shared Middleware/Application Deployment Support 12/16/2020 Data Center 009-000354597 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.414 Gross
582 Cloud Sandbox Services 12/2/2020 Data Center 009-000327772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.140 Gross
583 Mobility program PM and engineering support 9/10/2020 Other 009-000325770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Gross
584 Enterprise Application Monitoring Software and Services Licenses (AppDynamics) 9/30/2020 Software License Management 009-000354597 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.365 Gross
585 IT Helpdesk Equipment and Supplies 9/14/2020 Other 009-000325768 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.010 Gross
586 IT Helpdesk Regional Support 9/14/2020 Other 009-000325768 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.400 Gross
587 CAR Form Application  9/21/2020 Other 009-000325770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.100 Gross
588 OIMT Cost Allocation Model and TBM Support 9/11/2020 Other 009-000005322 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.350 Gross
589 EZProxy 12/16/2020 Software License Management 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.005 Gross
590 Knowledge Management Technologies and Services 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.600 Gross
591 OIMT-OIS CDM Program - Professional Services and Ancillary Software 9/14/2020 Other 009-000005321 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.400 Gross
592 OIMT-OIS Disaster Recovery 12/2/2020 Other 009-000005321 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.139 Gross
593 ILLiad Concierge Services 12/16/2020 Other 009-000327770 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.006 Gross
594 FY21 AirMagnet Wifi Analyzer Software Maintenance 2/11/2021 Software License Management 009-000325772 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross
595 OIMT-OIS-Palo Alto Hardware Maintenance 9/14/2020 Software License Management 009-000005321 Savings/avoidance prioritized toward various OIMT strategic IT initiatives including: Cloud Forward, Process Improvement, User Experience, Financial Management, Data Modernization, Unfunded Needs, and EoS/EoL Investments.  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.044 Gross
596 Turn off WAF in Gov AWS for RecoveryMonth 3/25/2021 Data Center 009-000350589 Used for other business needs  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.017 Gross
597 Splunk Server - power off 2/12/2021 Data Center 009-000350589 Used for other business needs  both  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.015 Gross
598 Downgrade RDS and EC instances in Gov AWS 3/5/2021 Data Center 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.042 Gross
599 Obsolete Instances deletion 2/19/2021 Data Center 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.018 Gross
600 Server decommissioned 1/4/2021 Data Center 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross
601 Migrate from the Contractor’s web servers to the SAMHSA web servers (SOAR)  3/21/2021 Data Center 009-000350643 To be determined by the Contracting Officer  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross
602 Cancellation of New Commercial Off-the-Shelf (COTS) data collection application (Tec Support DFW)

1/21/2021 Data Center 009-000326050 To be determined by the Contracting Officer  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.008 Gross
603 Migration from Oracle to PostgreSQL (BHSIS) 1/21/2021 Software License Management 009-000001417 To be determined by the Contracting Officer  both  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.500 Gross
604 Termination of the CARTO Cloud license for the Locator 1/1/2021 Data Center 009-000001417 To be determined by the Contracting Officer  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.029 Gross
605 The Department provided the Power BI licenses  3/1/2021 Software License Management 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.000 Gross
606 Cancellation of 3 extra Vitsual Studio  test licnese 3/23/2021 Software License Management 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.001 Gross
607 Downgraded RDS from Enterprise to Standard edition (PEPC) 3/8/2021 Data Center 009-000316501 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.017 Gross
608 Downgraded RDS from Enterprise to Standard edition Path PDX 3/5/2021 Data Center 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.017 Gross
609 Samhsa-prod-proxy c4.4xlarge to m4.2xlarge 2/23/2021 Other 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross
610 Gss-dev-solr01  resize EC2 to  M4-2XL 2/12/2021 Other 009-000350589 Used for other business needs  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.003 Gross
611 Centralization Authentication Services 6/29/2019 Other NA The upfront cost is a one-time cost by OCIO
The ACF AMS Portal is a “reusable” service that supports FISMA MFA compliance for ACF systems
OCIO manages/maintains the AMS Portal and puts in place preemptive actions to prevent any potential increases in future maintenance costs
It is a long term cost saving measure for ACF program offices, and provides cost savings to program offices such that they do not incur the one time up-front fee
Cost avoidance - A fee is established under the OCIO Budget TAP that provides a structure to manage costs and for FY cost tracking with the potential to lower increased expenses
 cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.175 Gross
612 AWS GSS 9/13/2017 Other NA Cost savings/advoidance is realized by reduction of TAP amount required by program offices for payment of rendered services.   both  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.060 Gross
613 Rightsize colocation space at Sterling data center 4/1/2021 Data Center 009-000407142 Resultant savings began in June 2021 and results from the decommissiong of data center rack at Sterling data center  cost-savings  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.014 Gross
614 NIH CIT Hostage and Storage Cost Avoidance 8/2/2021 Data Center NA These savings can be re-invested into other mission services.  cost-avoidance  0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.260 Gross
615 VMware (HHS ELA) 6/4/2021 Software License Management NA Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.076 Gross
616 TrendMicro 6/1/2021 Software License Management NA Savings used for other priorities. cost-savings 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.018 Gross
617 DataBricks 6/1/2021 Software License Management NA Savings used for other priorities. cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.610 Gross
618 Retirement of DPRF (IT system) CDER 10/11/2011 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.027 Gross
619 Retirement of DRLS (IT system) CDER 10/12/2011 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.020 Gross
620 Retirement of EES (IT system) CDER 10/13/2011 Other 009-000318788

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.213 Gross
621 Retirement of LIRA (IT system) CDER 10/14/2011 Other 009-000005345

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 1.809 Gross
622 Retirement of SPOTS (IT system) CDER 10/15/2011 Other 009-000318788

Reinvested funds into FDA CDER Integrated Data Management and FDA CDER Electronic Submissions  cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.509 Gross
623 Retirement of PQP Mobility (IT system) CDER 10/16/2011 Other 009-000338730 Reinvested funds into FDA CDER Marketplace for Regulatory Data cost-avoidance 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0 Gross 0.335 Gross